Laserfiche WebLink
that may still exist. .. The maps will show the location of existing da.ta points and the location <br />of permitted wells. These high priority areas will be the focus for Phase 2 data collection. <br />• Locations for Phase 2 field data collection may be chosen based on cooperation with <br />municipalities, water user groups and other well owners who agree to collaborate with the <br />Consultant on data collection activities. The Consultant will meet once with up to four water <br />user groups, including NCWCD, GASP, CCWCD and LSPWCD, to gain their perspectives <br />on data gaps and data collection priorities that exist following the Phase 1 work.. <br />• The Consultant will identify suitable locations and methods for up to 25 alluvial aquifer and <br />up to 1 bedrock monitoring wells to be constructed during Phase 2. Existing wells and new <br />wells being drilled and tested by others will be evaluated for use and testing in lieu of <br />installing new wells. <br />• In subsequent years it is expected that the workplan will be amended further to include the <br />procedures for new field tasks that will begin in that year, including streambed conductance <br />testing in Phase 3. <br />Deliverables: <br />Task 33.2 Phase 2 Field Study Workplan <br />• The Consultant will append the Phase 1 field study workplan with up to an additional 10 <br />pages of information (with additional pages for appendices) that will include the following <br />sections: <br />- Target areas for Phase 2 well construction and associated data collection <br />- Additional field protocols not already included in the Phase 1 workplan <br />- Budget and schedule for the program, including an itemized engineer's estimate of well <br />drilling and testing costs for each conceptual well design <br />The Consultant will provide six hard copies and one digital copy (in MSWord and Adobe <br />Acrobat PDF format) of the Draft Field Study Workplan for the State's review. The <br />Consultant will incorporate the State's comments and recommendations and provide a Final <br />Field Study Workplan. Six hard copies and one digital copy in MSWord and Adobe Acrobat <br />PDF format of the Final Workplan will be provided to the State. <br />Task 35: Construction and Testing of Alluvial Wells <br />Objective: <br />• The objective of this task is to extend the collection of field measurements from wells that <br />provided aquifer property and aquifer water level data for the alluvial ground water system in <br />the Denver Basin and the Lower South Platte Regions from the Phase 1 effort. Existing wells <br />and new wells being drilled and tested by others will be evaluated for use and testing in lieu of <br />installing new wells. <br />SPDSS Groundwater SOW, Phase 2 3 <br />