My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153953 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C153953 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2010 10:23:09 AM
Creation date
10/6/2006 12:10:06 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153953
Contractor Name
Camp Dresser & McKee
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 50 Development of a Data Centered A roach <br />Task 51 Phase 2 Management <br />A significant amount of work has been completed by previous investigators related to ground <br />water conditions in the study area, as summarized in the SPDSS Feasibility Study and in <br />Groundwater Phase 1 deliverables. The Phase 2 field data collection program (Tasks 33, 35, 36 <br />and 37) is a continuation of the Phase 1 field data collection effort (see Phase 1 Tasks 33, 35 and <br />36) to fill data gaps identified after historical data were collected and analyzed (see Phase 1 Tasks <br />31, 32, 38, 42, 43 and 44). Data obtained from the Phase 2 field data collection program will be <br />analyzed and added to the existing groundwater databases and maps (Tasks 42, 43, and 44). The <br />databases and maps are expected to be used in future years to update the existing groundwater <br />model of the Denver Basin Region (Task 47), and to support and expand modeling of the Lower <br />South Platte Region (Task 48). <br />All deliverables will be consistent with the DSS design, including use of data structures and <br />formats that are being developed by the Database DSS contractor. Deliverables will use DSS <br />standards for memo formats, report formats, database design and program documentation, etc. <br />Task 33: Field Study Workplan Development <br />Objective: <br />The objective of this task is to develop a Phase 2 field program and workplan. This field <br />program will fill some of the data gaps identified under Phase 1 Tasks 42, 43 and 44. This <br />workplan will guide the drilling and construction of observation wells, and conducting of aquifer <br />pumping tests in the Denver Basin and Lower South Platte Regions. <br />Approach: <br />Task 33.1 Phase 2 Data Collection Program Design. <br />The Consultant will develop a Phase 2 data collection program based on Phase 1 outcomes. <br />This will include drilling, installation and testing of up to 25 new alluvial aquifer observation <br />wells and 1 new bedrock aquifer observation well; collecting water levels from existing wells; <br />and conducting aquifer pumping tests. If existing wells are available and fill in data gaps, they <br />may be used instead of installing and testing new wells and the number of new Phase 2 wells <br />may be reduced. <br />• For new wells, the field procedures that were developed under Phase 1(for site access, control <br />and reclamation, well drilling, sampling and well construction, borehole and core sample <br />testing; water level measurements, health and safety, field QA/QC protocols, and field <br />documentation requirements) will be used. Additional procedures will be added to the <br />workplan to address conditions or data collection activities that are new for Phase 2. <br />• Maps of the Denver Basin and Lower South Platte Regions developed in Phase 1 will be used <br />to depict areas considered by the Consultant to be high priorities for collection of new <br />hydrogeologic data, based on data collected during Phase 1 and based on data gaps identified <br />SPDSS Groundwater SOW, Phase 2 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.