My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153953 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C153953 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2010 10:23:09 AM
Creation date
10/6/2006 12:10:06 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153953
Contractor Name
Camp Dresser & McKee
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
incorporation into the system design. User interface issues will also be addressed through this <br />process. <br />• A detailed summary of proposed data centered approach to ground water modeling will be <br />developed that includes the data management component, process management component <br />and model management component. These processes will include both conceptual and <br />numerical modeling components. Ideally, data and process definitions will flow to a <br />framework- independent conceptual model. This conceptual model and associated data then <br />can be cast onto a numerical model framework for simulations and analysis of alternatives. <br />Elements in these components that are suitable for automation and will result in improved <br />quality, reliability and usability will be defined. A peer review group including the <br />Consultant, the State and approximately two other parties will meet two times for <br />approximately 4 hours to review and refine this evaluation. <br />• The suitability of existing computer tools that have been developed for other DSS processes <br />will be assessed. These tools may be included in the design and necessary enhancements will <br />be defined during the process. Linkage or user interface requirements will be defined. <br />A requirements summary will be developed and elements prioritized to determine which of <br />these elements will be included in the implementation scope of work. The prioritization will <br />be done cooperatively with the State. This requirements analysis will address the use of and <br />integrated system versus multi-step processes. <br />Deliverables: <br />• Draft and Final Technical Memoranda (TM) up to 10 pages in length will be prepared that <br />will summarize the results of this task that include: <br />- a summary of the interviews, <br />- a suxmnary of the proposed data centered approach to ground water modeling, <br />- the suitability of existing computer tools that have been developed for other DSS processes, <br />and <br />- a requirement summary. <br />• The final TM will incorporate the State's comments and recommendations. The results of the <br />final TM will serve as the basis for Task 50.3, implementation scope of work. <br />Task 50.3 Implementation Scope of Work <br />Approach: <br />• A draft implementation scope of work will be developed, based on Tasks 50.1 and 50.2. The <br />specific tasks will be described, along with the schedule and cost for implementing. <br />Opportunities for phasing implementation will also be identified in this document. <br />SPDSS Groundwater SOW, Phase 2 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.