My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00481
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00481
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:00 AM
Creation date
10/6/2006 12:09:09 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153502
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Water District
0
County
Hinsdale
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />., <br /> <br />. <br />. 1 <br /> <br />= <br /> <br />G. Proqress Reports <br /> <br />The ENGINEER shall at all times keep the OWNER apprised of <br />the progress of the feasibility study by providing weekly oral <br />reports to the OWNER'S Project Manager, Mr. Barry Nelson, and <br />written progress reports, detailing the work done and results <br />obtained to date, every two weeks. <br /> <br />SECTION B - SCHEDULE OF WORK <br /> <br />The services called for in Section A of this Agreement <br />shall be completed and the report submitted within one hundred <br />(100) calendar days from the date of this Contract. The <br />ENGINEER will complete the feasibility study and submit the same <br />for approval by the OWNER, CWCB, and all state regulatory <br />agencies within one hundred (100) days of the date of this <br />contract unless otherwise agreed to by both parties. The time <br />for completion will be extend~d by the OWNER for a reasonable <br />time if completion is delayed dUe to unforeseeable causes beyond <br />the control and without the fault of negligence of the ENGINEER. <br /> <br />SECTION C - COMPENSATION FOR ENGINEERING SERVICES <br /> <br />1. If the feasibility atudy and this Agreement are not <br />previously terminated by the OWNER in accordance with Paragraph <br />C.2 or C. 3 below, the OWNER shall compensate the ENGINEER for <br />engineering services in a sum not to exceed $67,200.00, allo- <br />cated as follows: continental Dam: $31,775. Santa Maria Dam; <br />$35,425. The payments will be made within forty-five (45) days <br />of receiving the invoices. A retention of $11,000.00 will be <br />withheld by the OWNER until approval of the final feasibility <br />study by both the OWNER and the CWCB. <br /> <br />The invoicing schedule is as follows: <br /> <br />Upon signing of the ~ontract <br /> <br />Thirty (30) days after signing <br />of the contract <br /> <br />$ 38,000.00 <br /> <br />Upon approval of report <br /> <br />$ 18,200.00 <br />$ 11,000.00 <br /> <br />Invoices will be submitted to The Santa Maria Reservoir <br />Company with a progress and status report. <br /> <br />2. If in the course of the feasibility study it is deter- <br />mined that the seepage problem at one of the reservoirs under <br />stUdy may be corrected by means of readily available, and rela- <br />tively simple and inexpensive methods, then the ,OWNER may ter- <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.