My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00467
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:59 AM
Creation date
10/6/2006 12:08:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150132
Contractor Name
GMS Land & Cattle Company
Contract Type
Loan
Water District
0
County
Weld
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CWCB Construction Fund Loan Aoolication <br /> <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attomey(s). <br />NAME ADDRESS and PHONE <br /> <br />DUANE SMITII <br />SMITII GEOTECHNICAL <br />PHONE 9704902620 <br /> <br />1225 RED CEDAR cmcu:, SUITE H <br />FORT COLLINS, CO 80524 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in progress for <br />the proposed project. Please submit one copy of each completed study with this application. <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated construction <br />costs, ifknown. <br /> <br /> <br />~ o<D <br />Estimated Construction Costs: $ .[) I 'f ) ~ r b <br />$ 22;( m(, <br />. J <br />10. Loan amount and tenns you are re'i'!estmg. <br />Requested Loan Amount: $ .] 00 ocO <br />I <br />:;'0 <br />;2-,1570 <br /> <br />Estimated Total Costs: <br /> <br />Estimated Engineering Costs: $ <br /> <br />9ft) .zlu"'~:' ~irnated Total Costs) <br /> <br />Term (length) ofloan: <br /> <br />years (U5Wllly 10,20, or 30 y""') <br /> <br />Interest Rate: <br /> <br />% (pI~e call for OUT alITent rates.) <br /> <br />Part C. - Project Sponsor Financial information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor have <br />the financial capacity to repay any loans made by the CWCR The following information is needed to <br />assist the CWeB in a preliminary assessment of the applicant's financial capacity. It is also requested that <br />the project sponsor submit with this application copies of the two most recent annual reports, financial <br />statements, corporate reports or other current documentation of financial condition and operations. <br /> <br />1. List any existing liability or indebtedness that exceeds one thousand dollars. For example, bank loans, <br />government agency loans, bond issues, accounts payable, etc. Include names and addresses of <br />lenders. amounts, due dates and maturity dates. Attach a separate schedule, if needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.