Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CWCB Construction Fund Loan Application <br /> <br />Please provide a brief description of the owner's existing water supply facilities and describe any <br />existing operational or maintenance problems. Attach separate sheets if needed, and a map of the <br />service area. . SEE ENGINEERS REl'ORT <br /> <br />For existing facilities indicate: <br /> <br />Number of shareholders <br /> <br />Current Assessment per share $ <br />Number of acres irrigated 160 ACRES <br /> <br />or Number of customers served <br /> <br />Number of shares <br /> <br />Part B. Description of the Proiect <br /> <br />I. Name of the project or facility GIFFIN DAM # 1 AND #2 <br />2. PU/pose of this loan application. Check one. <br />New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br /> <br />x <br /> <br />Other (describe) <br /> <br /> <br />3. If the project is for rehabilitation ofan existing reservoir, is the reservoir currently under a storage <br />restriction order from the State Engineer? YES _ NO _X_ <br /> <br />General location of the project. (Please include county, and approximate distance and <br />direction from nearest town., as well as legal description, if known. SOUTHWEST SECTION 18, <br />R. 10 N., R. 66 W. OF THE 6TH P.M. <br /> <br />4. Please provide a brief narrative description of the proposed project including pU/pose, need, facilities, <br />type of water uses to be served and service area. Attach separate sheet, if needed. REHABILITATE <br />THE GIFFIN # 1 AND #2 DAM AND DREDGE SILT FROM THE BOTTOM OF THE <br />RESERVOIRS <br />5. Water Right: 2.09 CFS. Average water diverted per year: 160 acre-feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? NO <br /> <br />2 <br /> <br />C.FI .A602 <br />