<br />. <br /> <br /> Table 1 - JPSP <br /> Martin Cnll Dam Rehabilitation/Repair - Cost Estimate - Alternatives No.3 and No.4 <br /> Item Onantitv Unit Unit Price $ Amount $ <br /> Mobilization I L.S, ]5,000 15,000 <br /> Clearing and Grubbing I L.S, 1,500 1,500 <br /> Topsoil Removal I L.S, 1,000 1,000 <br /> Upstream Embankment Overexcavation 18,000 yd' 2 36,000 <br /> Borrow Excavation 25,000 yd' 2,50 62,500 <br /> Embankment Backfill <br /> (US & DS Embankments) 35,000 yd' 2 70,000 <br />. Seep Drain Installation 100 L.F, 30 3,000 <br />Concrete Inlet Structure ] L.S, 2,000 2,000 <br /> Grouting Old Outlet Pipe 220 L.F, 22,70 5,000 <br /> New Outlet Pipe Installation <br /> (Includes trenching & backfilling) 500 L.F, 40 20,000 <br /> Cutoff Collars 2 Ea, 500 1,000 <br /> Precast Manhole I L.S, 3,800 3,800 <br /> Precast Gate Chamber w/12" Sluice Gate <br /> And Operating Rod L.S, 5,500 5,500 <br /> Rip Rap Stilling Basin & Seep Drain <br /> (Includes fabric or bedding materials L.S, 1,200 1,200 <br /> Rip Rap Upstream Face of Embankment <br /> (Includes fabric or bedding materials L.S, 24,000 24,000 <br /> Topsoil Replacement & Revegetation L.S, 1,500 1,500 <br /> Dewatering L.S, 1,000 1,000 <br /> Engineering Design, Construction Observation & Testing Job 47,000 47.000 <br /> Subtotal for Alternative No.3 $300,000 <br /> Raising Embankment 2' 1,111 yd' 4,50 5,000 <br />. ModifY Existing Concrete Spillway Structure I L.S, ]5,000 14,000 <br /> Grout Spillway Structure Abutments I L.S, 11,000 11,000 <br /> Total for Alternative No.4 $330,000 <br /> <br />Implementation Schedule <br /> <br />As noted previously, the plans and specifications for Alternative No, 3 have been submitted and approved <br />by the State of Colorado, NWCC, Inc, and Water Resource Consultants, LLC are expected to complete the <br />plans and specifications for the modifications outlined in Alternative No, 4 by the end of May and except to <br />receive approval from the State Engineer's Office by the frrst of August 2002, Construction is expected to <br /> <br />. <br /> <br />Martin Cull Dam Rehabilitation Feasibility Study <br /> <br />May 2002 <br /> <br />Page 5 <br />