Laserfiche WebLink
<br />. <br /> <br />Mr. Brian Len <br />November 6, 2001 <br /> <br />Page 2 <br /> <br />Please submit "As-Constructed" mylar drawings, including the original certification sheet and <br />one set of blueline drawings, upon completion of construction. The mylar drawings should be <br />prepared in accordance with the requirements of Rule 5.A.(2)(c) of the Rules and Regulations. Final <br />acceptance of the construction will be contingent upon receipt and our acceptance of the "As- <br />Constructed" drawings, as well as the other requirements of Rule 10 (copy enclosed) of the Rules <br />and Regulations, If you have any questions concerning the filing of "As-Constructed" drawings or any <br />other completion document, please contact Mr. Haynes, <br /> <br />We look forward to working with you on this construction project and to achieving a successful <br />completion of the proposed modifications to the dam and appurtenant structures. <br /> <br />Sincerely, <br /> <br />. <br /> <br />~~ <br />~~~!yers 7 <br />Assistant State Engineer <br /> <br />Enclosures: Copy of Rule 9 and 10 of the "Rules and Regulations for Dam Safety and Dam <br />Construction" , <br /> <br />xc: Bob Plaska, Division Engineer (w/o enclosures) <br />Sally Lewis, Dam Safety Field Engineer (w/o enclosures) <br />Mark Haynes, Design Review Engineer (wI approved plans and specifications) <br />Kathy Bower, Water Commissioner (w/o encloSures) <br />Paul Currier, Engineer <br /> <br />. <br /> <br />. <br />