Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />and to the pump ponds that supply the center-pivot sprinkJer systems. The measurement needs at <br />these two services are quire different and require very different now measuring devices. <br /> <br />The Control Structures to be modified are shown on the map provided in Appendix A and also on <br />Figures 2 through 9. The type of measuring devices proposed at the headgates are shown on <br />Figures 10 and 11 for lhe two conditions shown as SA and 5B on the map in Appendix A. <br /> <br />Control Structures <br /> <br />Structure 1 ~ Owl Creek 'Vest Cut Split. This SUUcture is shown on the map in Appendix <br />A and indic,ued as Number 1. The Structure is used to split the flows between the West Cm <br />Ditch and the Owl Creek Ditch. The Structure is used to proponion the flows in <br />approximately a 50% split. Under current operations, the maximum flow is estimated to be <br />75 cfs in each direction. The existing Slructure has been modified at least rwice and is in poor <br />condition. The Structure is located on a relatively straight reach of the canal, so that approach <br />conditions are generally good. The channel is generally srable, both upstream and <br />downstream for the structure. The Structure also serves as a check-drop, with a drop of <br />approximately 1.5 feet. Erosion protection downstream of the structure is currently <br />inadequate, both with respect to configuration and material. The downstream plunge pool <br />should be configured to provide bank protection. energy managemem, and a smooth transition <br />to the downstream conditions. Those objectives can be largely achieved by proper riprap <br />sizing and placement below a new structure. <br /> <br />The proposed new Structure allows for a one-foot thick reinforced concrete floor, with 8-inch <br />walls and wingwalls. Some riprap bedding material would need to be imported to the site, <br />and existing available broken concrete riprap should be broken up such that the maximum <br />dimension is no greater than 3 times the minimwn dimension. Riprap should be hand-placed <br />over bedding material to specified Contours to provide the previously mentioned hydraulic <br />objectives. <br /> <br />The Structure has been designed as a replogle flume with a drop of 1.5 feet: sized for 75 cfs <br />maximum flow in each lateral; with a maximum head of 2 feet. The details of the Structure <br />are shown on Figure 2. <br /> <br />Structure 2 - Check Drop at 'VCR 76. This location for this structure is shown on the map <br />in Appendix A and indicated as Number 2. The purpose of the proposed struCture is to <br />provide a water level comrol for tum-ouIS to the north and west of WCR 76. Currently the <br />flows are checked at this location by a temporary rock check that is replaced each year. <br />There is no existing structure. Under current operations, the maximum flow is estimated to <br />be 200 cfs in the Owl Creek Lateral. The structure can easily be configured as a measuring <br />flume immediatelv dO\\'nstream of the County Road 76 Bridge to provide an intermediate <br />poim to check lateral discharge. <br /> <br />The proposed Structure is located on a relatively straight reach of the lateral. with good <br /> <br />Owl Creek Feasibility <br /> <br />Page 7 <br />