My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00342
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2011 3:11:08 PM
Creation date
10/6/2006 12:06:06 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150145
Contractor Name
Spring Dale Ditch Company
Contract Type
Loan
Water District
64
County
Logan
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The SDC, according to State Engineer records found in appendix A, <br />diverts on average approximately 7,150 acre feet of water per <br />year for irrigation. The SDC also plans to divert approximately <br />4,000 acre feet of water for augmentation purposes. The SDC is <br />currently seeking an augmentation decree in water court for these <br />anticipated diversions. <br /> <br />Cost Estimate <br /> <br />The estimated total project <br />and engineering design will <br />Engineering Services, LLC. <br /> <br />cost is $135,000. Project planning <br />be provided by Brent Nation of Nation <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Total Cost <br /> <br />$ 2,000 <br />$133,000 <br /> <br />$135,000 <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Total Cost <br /> <br />$ 30,000 <br />$ 48,500 <br />$ 6,500 <br />$ 15,000 <br />$ 5,000 <br />$ 15,000 <br />$ 13,000 <br />$ 2,000 <br /> <br />$135,000 <br /> <br />1. Augmentation Well (1 total) <br />2. Recharge Wells (2 total) <br />3. Lift Station <br />4; Measuring Devices <br />5. Electricity <br />6. Dirt Work (2 ponds) <br />7. Contingency <br />8. Planning and Design Costs <br /> <br />feasibility Study <br />Springdale Ditch Company <br />Augmentati.on Project <br />May 2003 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.