Laserfiche WebLink
<br />The SDC, according to State Engineer records found in appendix A, <br />diverts on average approximately 7,150 acre feet of water per <br />year for irrigation. The SDC also plans to divert approximately <br />4,000 acre feet of water for augmentation purposes. The SDC is <br />currently seeking an augmentation decree in water court for these <br />anticipated diversions. <br /> <br />Cost Estimate <br /> <br />The estimated total project <br />and engineering design will <br />Engineering Services, LLC. <br /> <br />cost is $135,000. Project planning <br />be provided by Brent Nation of Nation <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Total Cost <br /> <br />$ 2,000 <br />$133,000 <br /> <br />$135,000 <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Total Cost <br /> <br />$ 30,000 <br />$ 48,500 <br />$ 6,500 <br />$ 15,000 <br />$ 5,000 <br />$ 15,000 <br />$ 13,000 <br />$ 2,000 <br /> <br />$135,000 <br /> <br />1. Augmentation Well (1 total) <br />2. Recharge Wells (2 total) <br />3. Lift Station <br />4; Measuring Devices <br />5. Electricity <br />6. Dirt Work (2 ponds) <br />7. Contingency <br />8. Planning and Design Costs <br /> <br />feasibility Study <br />Springdale Ditch Company <br />Augmentati.on Project <br />May 2003 <br /> <br />6 <br />