My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150009 Contract
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150009 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2015 2:48:23 PM
Creation date
10/6/2006 12:05:50 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150009
Contractor Name
Boulder and Left Hand Irrigation Company
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
SPL
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENCY NAME: Water Conservation Board <br />AGENCY NUMBER; PDA <br />ROUTING NUMBER: 02 PDA �('jOS .Z <br />CONTRACT AMENDMENT NO. 1 <br />THIS AMENDMENT, made this 1S� day of February 2002, by and between the <br />State of Colorado for the use and benefit of the Department of Natural Resources, <br />Colorado Water Conservation Board, hereinafter referred to as the GWCB and/or <br />STATE, and the Boulder and Left Hand Irrigation Company, hereinafter referred to as <br />th2 BORROWER 811di0� CONTRACTOR. <br />Factual Recitals <br />A. Authority exists in the law, and funds have been budgeted, appropriated, and <br />othenvise made available and a sufficient unencumbered balance thereof remains <br />available for payment under Contract Encumbrance Number C150009. <br />B. Required approval, clearance, and coordination has been accomplished from and with <br />appropriate agencies. <br />C. The State and the Contractor entered into a contract dated May 8, 2000, Contract <br />Encumbrance Number C150009, hereinafter referred to as the Original Contract and <br />incorporated herein by reference, wherein the State agceed to 4oan money in the <br />total amount of $100,000 and the Contractor agreed to repay the loan in accordance <br />with the terms of the Original Contract. <br />D. The Contractor has submitted a request that the property originally pledged as <br />collateral for the loan, Twin Lakes Dam and Reservoir, be released and substitute <br />Gqll2te�31 b@ tak�� av �h� CW�� ?g sec�rity f�r tha Ip?n. 7ha C�nntrar_.tnr hag <br />arranged for the sale of its surface rights at Twin Lakes to Boulder County Parks <br />and Open Space. The CWCB approved the loan with the requirement that the <br />Contractor provide collateral in the form of "... real property of value equal to the <br />ioan amount." The Contractor has offered Hayden Lake property as substitute <br />collateral. The CWCB has determined that the value of the Hayden Lake property <br />exceeds the loan amount and therefore would satisfy the CWCB collateral <br />requirements. <br />E. The parties agree to amend the contract to substitute the collateral. <br />
The URL can be used to link to this page
Your browser does not support the video tag.