My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150108 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150108 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:25:25 AM
Creation date
10/6/2006 12:05:36 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150108
Contractor Name
Delta Canal Company, The
Contract Type
Loan
Water District
40
County
Delta
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />USD~ A Natural Resources C0 <br />'t\ Delta Field Office <br />_ 690 Industrial Blvd, <br />~ Delta, CO 81416 <br />- 970-874-5735 <br /> <br />""rvation Service <br /> <br />Conservation Plan <br /> <br />Delta Canal Company <br />477 1600 Road <br />Delta, CO 81416 <br /> <br />Crop <br />I <br /> <br />Tract: 1600 <br /> <br />STRUCTURE FOR WATER CONTROL <br />OFF FARM - Concrete structure with needed components will be installed in accordance with an <br />'!pproved NRCS design and Standards and Specifications, Estimated effective lifespan is 20 years, <br />This practice will be maintained and operated in accordance with the O&M Agreement. <br />CIN 1 includes 10 CY of formed and reinf"rced concrete for an inleVspillback structure and 4 CY to <br />serve as headwalls on the CMP crossing the drain ditch"CIN 3 includes 14 CY for headwalls on 7 <br />driveway crossings and 16 CY for 4 diversion/drop structures, CIN 5 has 2 diversion/drop structures, <br />Each structure(in CINs 3 & 5) has a 15" headgate, with the exception of the second one, which is 21", <br />CIN 3=(3x15")+21"=66 units; CIN 5=2x15"=30 units, <br /> <br /> Planned Applied <br />Field Amount Month Year Amount Date <br />off 3,0 no, 10 2001 <br />off 11,0 no, 3 2002 <br />off 2,0 no, 3 2003 <br />Total: 16,0 no, <br /> <br />IRRIGATION WATER CONVEYANCE, NONREINFORCED CONCRETE DITCH AND CANAL LINING <br /> <br />OFF FARM. A fixed lining of non.reinforced concrete with needed components will be installed in <br />accordance with an NRCS design and standards and specifications, Effective iifespan is 20 years, <br />This practice will be operated and maintained according to design, at no additional cost to the <br />government, during it's 'effective Hfespan, CIN 2 includes 20' of 42" CMP for a field driveway and a <br />tolal of 60' of 42" CMP to cross the drain ditch, 80'x42"=3360 units, CIN 4 includes 210' of 42" CMP <br />for 7 driveway crossings, 210'x42"=8820 units (only 8819 units shown in contract to keep total cis $ at <br />amount approved) <br /> <br /> Planned Applied <br />Field Amount Month, Year Amount Date <br />off 1,900,0 ft, 10 2001 <br />off 3,300,0 ft, 3 2002 <br />off 830,0 ft, 3 2003 <br />Total: 6,030,0 ft, <br /> <br />3/8/01 <br /> <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.