Laserfiche WebLink
<br />i <br /> <br />. <br /> <br />.. <br /> <br />'--J~ <br />...- <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />721 State Centenmal Building ~ <br />1313 Sherman Street <br />Denver. Colorado 80203 <br />Phone (303) 866.3441 <br />FAX (303) 866-4474 <br /> <br />STATE OF COLORADO <br /> <br />'0 <br /> <br />Roy Romer <br />9overnor <br /> <br />September 22, 1994 <br /> <br />James S. Lochhead <br />Executive Director. DNR <br /> <br />Ms. June Estep, Secretary <br />Norwood Water Commission <br />PO Box 528 <br />Norwood, CO 81423 <br /> <br />Daries C. Lile, P.E <br />Director, eweB <br /> <br />RE: Norwood Raw Water System Improvements <br /> <br />Dear Ms. Estep: <br /> <br />Please be advised that we are in receipt of your letter of September 12 regarding water system <br />improvements for the Town of Norwood. Your request for five thousand dollars in planning funds <br />under the Small Dam Site Reconnaissance Program and for a feasibility study loan of seven thousand <br />five hundred dollars has been approved with the understanding that the funds are to be used for a <br />feasibility study of raw water system improvements which might be eligible for funding from the <br />CWCB Construction Fund. <br /> <br />We have also received a Plan of Study for the feasibility work dated September 8, 1994 from <br />WestWater Engineering, The Plan of Study is in conformance with the CWCB Construction Fund <br />Guidelines and is considered acceptable for the feasibility study. <br /> <br />We are in the process of drafting a purchase order with a letter of agreement for the five thousand <br />dollars and a feasibility study loan contract for the seven thousand five hundred dollars. Drafts of <br />these items will be sent to you in the next few Weeks. Please be advised that the loan contract will <br />require an ordinance adopted by the Town Board in the format provided in the enclosed draft, <br /> <br />Your request for funding for engineering design work under your existing authorization is currently <br />being considered. Our response will depend, at least in part, upon the results of the feasibility study. <br /> <br />Please let me know if you have any questions on any of these items. We look forward to working <br />with you on this very important project. <br /> <br />Sincerely, <br /> <br />:Z5~~ <br /> <br />William E.Green, P.E. <br />Project Planning and Construction <br /> <br />cc: Bill Hamann, WestWater Engineering <br />