Laserfiche WebLink
<br />" <br /> <br />,;\:~"'" <br />,,~.., ,~' -J <br /> <br />June 20, 1994 <br />Page 5 <br /> <br />, <br /> <br />1. Previous expenditures (exclusive of Loan Asst.) - $8,834 <br /> <br />2. Future expenditures (exclusive of legal) $9.700 <br />Total cost - $18,534 <br /> <br />It is recommended that you contact CWCB to determine if a <br />grant or cost-sharing is available. <br /> <br />Pro;ect Schedule. It will take approximately 75 days <br />after we have received the Noti~e to Proceed to complete the <br />report. Of this, approximately 30 days would be devoted to <br />field investigation and the rem~inder to report preparation. <br /> <br />Pro;ect Responsibilitv. W~stWater Engineering would be <br />responsible for collecting the ~eotechhical information, field <br />information on ground elevation$, collection of any additional <br />data required for the report, the preliminary design, and cost <br />estimates. We will need updateG information from the <br />Commission on water usage, financial situation, water rights <br />and similar items. <br /> <br />, <br /> <br />We appreciate the opportunity to submit this proposal for <br />this project and look forward te working with you. If you have <br />any questions or comments, please let me kno~. If you are in <br />agreement with this proposal, please sign below. <br /> <br />sincerely, <br /> <br />William D. Hamann, P.E. <br /> <br />WDH/sc <br /> <br />ACCEPTED: <br /> <br />Date <br /> <br />Norwood Water Commission <br /> <br />) <br />