Laserfiche WebLink
<br />~.-. ....... <br /> <br />,/'" <br /> <br />~ <br /> <br />~ <br /> <br />"\NestWater Engineering <br /> <br />Consulting Engineers <br /> <br />(' <br /> <br /> <br />2516 FORESIGHT CIRCLE, #1 <br />June 20, 1994 <br /> <br /> <br />RAND JUNCTION, COLORADO 81505 <br />7 <br />" <br />./' <br />t? <br /> <br />(303) 241-7076 <br /> <br />FAX (~03) 241.7097 <br /> <br />Town of Norwood Water Commissio~ <br />Box 528 <br />Norwood, CO 81423 <br /> <br />RE: Proposal for Feasibility R~port for CWCB Loan <br /> <br />Dear Members of the Board, <br /> <br />( <br /> <br />As you may know, the staff of the Colorado Water <br />Conservation Board has apparently prepared a contract for the <br />$320,000 low-interest loan, which is to be used for <br />constr~ction of a new reservoir. Contract administration for <br />the project has apparently been taken over by Bill Green in <br />their Denver office. I don't know Mr. Green's exact title; <br />however, he was the Project Man~ger for the San Miguel report <br />and is quite familiar with the ~rea. In a recent telephone <br />conversation he informed me that Norwood would have to prepare <br />a Feasibility Report before the Contract could be signed and <br />the loan funds released. Although the 1991 preliminary <br />Engineering Report provided information on the proposed <br />reservoir, CWCB requires that We use their specific format. In <br />addition, the sites described in the earlier Preliminary Report <br />do not include the proposed site. CWCB would like more <br />specific information on the site and more detailed information <br />on the proposed design. <br /> <br />-. <br /> <br />The purpose of this letter is to outline our proposal to <br />prepare the Feasibility Report as required by CWCB. The <br />specific requirements for a standard Feasibility Report. are <br />covered in pages 17 through 27 of their Guidance Manual (copies <br />enclosed). Some of the information required in the CWCB <br />guidelines will not be applicable to your project, i.e., <br />information on irrigated land, details on canals and spillways, <br />etc. We will use as much information from the 1991 Preliminary <br />Report as possible. For example, Chapter IV of the CWCB <br />guidelines requests information on water requirements, water <br />rights and water quality. A substantial portion of this we can <br />take from the earlier report; however, we it will have to be <br />updated, expanded and rearranged. <br /> <br />\. <br /> <br />The Feasibility Report will be based upon construction of <br />a 10 million gallon earthen reservoir at a site west of the <br />water treatment plant. This will result in a combined total of <br />20 million gallons of storage ~vailable to Norwood. It is <br />probable that the reservoirs will have to be refilled at least <br />once during the winter, particularly as growth occurs. A <br /> <br />APPENDIX B <br /> <br />WATER WORKS ANQ SEWERAGE FACILITIES' STOllM DRAINAGE AND STREETS' WATER QUALITY STUDIES <br />