Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1. Replace the existing pipeline with anew, larger pipeline operating under <br />open channel flow (upstream control). <br /> <br />2. Replace the existing pipeline with a new larger pipeline designed to be fully <br />pressurized under all flow conditions (downstream control). <br /> <br />3. Replace the existing pipeline with a same size pipe; construct an eqllllH7.ing <br />reservoir above the water treatment plant which can store water conveyed in <br />the Cottonwood Creek pipeline. <br /> <br />4. A No-Action alternative. <br /> <br />A water conservation program will also be considered. However, this would <br />apply equally to all alternatives. <br /> <br />ll-2 <br />