My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00189
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 9:50:07 AM
Creation date
10/6/2006 12:04:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150006
Contractor Name
Palisade, Town of
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1. Replace the existing pipeline with anew, larger pipeline operating under <br />open channel flow (upstream control). <br /> <br />2. Replace the existing pipeline with a new larger pipeline designed to be fully <br />pressurized under all flow conditions (downstream control). <br /> <br />3. Replace the existing pipeline with a same size pipe; construct an eqllllH7.ing <br />reservoir above the water treatment plant which can store water conveyed in <br />the Cottonwood Creek pipeline. <br /> <br />4. A No-Action alternative. <br /> <br />A water conservation program will also be considered. However, this would <br />apply equally to all alternatives. <br /> <br />ll-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.