My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00189
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 9:50:07 AM
Creation date
10/6/2006 12:04:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150006
Contractor Name
Palisade, Town of
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Including 'carriage water' and Ute supplemental water in the analysis may not <br />necessarily require any oversizing of pipes. The exact theoretical pipe diameter <br />for carrying the Town's flows is first calculated. Since pipes are available <br />only in specific sizes, the next leu-ger pipe is always selected and this <br />automatically provides extra caPacity. <br /> <br />6. Combined Water Demand. <br /> <br />Pipeline Alternatives: The four scenarios for pipeline capacity which were <br />discussed are as follows: <br /> <br />Normal Operation <br /> <br />Scenario A <br />Palisade <br />Only <br /> <br />Scenario B <br />Palisade <br />& Ute <br /> <br />Palisade Max. Day in 2025 <br />Surplus water to Ute <br />Carriage water <br /> <br />3.2 mgd <br />.5 mgd <br />I mgd <br />3.8 mgd <br /> <br />3.2 mgd <br />.0 mgd <br />.Lmgd <br />3.3 mgd <br /> <br />"mergenI;}' O.pel'lltion <br /> <br />Scenario C <br />Palisade & Ute <br /> <br />SC".enario D <br />Pali""cle & Ute <br /> <br />Carriage Water <br />Palisade Max. Day in 2025 <br />Ute Water Peak Flows <br /> <br />0.1 mgd <br />3.2 mgd <br />7.0 mgd <br />7.3 mgd <br /> <br />0.1 mgd <br />3.2 mgd <br />lil..Q mgd <br />13.3 mgd <br /> <br />Alternative pipe sizes will be eValuated for the various scenarios. <br /> <br />Reservoir Alternative. The low elevation equalizing reservoir (Alternate 3) <br />must have adequate size to carry water through the summer, when outflow is <br />expected to be greater than inflow. It is refilled during the winter, when <br />demand drops off. <br /> <br />C. <br /> <br />ALTERNATIVE 1 - NEW PIPELll-ffi DESIGNED FOR NON-PRESSURIZED <br />FLOW <br /> <br />1. Factors to Consider in Analysis of a Non-Pressurized Pipelinp.. <br /> <br />Description of Pipe. The existing Cottonwood Creek pipeline from Cabin <br />Reservoir to the water treatment plant consists of the following segments. <br />Each operates differently from other segments under non-pressurized flows and <br />has its own capacity. <br /> <br />V-9 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.