My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00189
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 9:50:07 AM
Creation date
10/6/2006 12:04:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150006
Contractor Name
Palisade, Town of
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The pipeline system into and out of Cabin Reservoir involves several <br />pipelines, which are shown in Figure IV-6. Water from Cabin <br />Reservoir can be released only down the Cottonwood Creek pipeline. <br /> <br />The collection pipes have been installed intermittently over a 6O-year <br />period, and the process is on-going. All of the older pipeline is <br />cast iron or ductile iron pipe. Much of it uses lead joint pipes. <br />Much of the pipe is either on the surface or within two feet of the <br />surface. Pipelines installed within the last 20 years are usually PVC <br />pipe. <br /> <br />3. <br /> <br />Sqpply Pipelines <br /> <br />a. General. There are two pipelines which convey water from the <br />upper basins to the water treatment plant: the Cottonwood Creek <br />pipeline and the Rapid Creek pipeline (Figure IV.:t). The <br />Cottonwood Creek pipeline can carry water from almost all water <br />sources, including Cabin Reservoir and Kruzen Springs. Both pipes <br />operate under non-pressurized (atmospheric) flow regimes, and are <br />controlled by upstream valves; both usually flow continuously <br />(depending on water plant demand) with excess water diverted into <br />Rapid Creek at a blow-off valve. <br /> <br />b. Cottonwood (Creek Pipeline The Cottonwood Creek pipeline is <br />the focus of this report, i.e., is the pipeline recommended for <br />replacement. <br /> <br />The Cottonwood Creek pipeline presently extends from Cabin <br />Reservoir on its upper end to a connection with the main raw water <br />pipeline on Rapid Creek (the Wye). Below the Wye, a new 12 inch <br />main carries water to the water plant. Most of the pipeline is <br />located in the relatively narrow, rock walled canyon of Cottonwood <br />Creek. The pipeline conveys water from Cabin Reservoir, Kruzen <br />Springs and diversions on Cottonwood Creek. It supplies water for <br />both the Town of Palisade water plant and the Ute water treatment <br />plant. <br /> <br />The Cottonwood Creek pipeline from Cabin Reservoir to the Wye <br />consists of about 11,000 feet of 8 inch pipe, and about 11,000 feet <br />of 6 inch pipe, for a total length of approximately 22,000 feet (4.2 <br />miles). The pipeline is approximately 50 years old and has <br />deteriorated over the years. It is mostly cast iron pipe with lead <br />joints. It has incurred numerous breaks in the past few years and <br />does not have adequate capacity to meet the Town's's future needs. <br />It operates primarily under open channel flow; there are several vent <br /> <br />IV-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.