Laserfiche WebLink
<br />9. At its March 10-11, 1998 meeting, the CWCB found that delay in completing the PROJECT would <br />cause undue hardship to the BORROWER and approved a loan to the BORROWER from the Small <br />Project Loan Account of up to $29,000 at an interest rate of 3.5% per annum for a duration of 10 <br />years, <br /> <br />10. The STATE now desires, by this contract, to loan money to the BORROWER for this PROJECT upon <br />mutually agreeable terms and conditions. <br /> <br />THEREFORE, in consideration of the mutual and dependent covenants contained herein, the <br />parties agree as follows: <br /> <br />A The BORROWER agrees as follows: <br /> <br />1. Construction Fund Program Procedures. The following items are procedures the BORROWER <br />shall follow during the construction phase of the PROJECT. <br /> <br />a. The BORROWER shall employ an engineer, registered in the State of Colorado, hereinafter <br />referred to as the CONSULTANT, to prepare plans and specifications for the PROJECT. <br /> <br />b. The agreement between the BORROWER and the CONSULTANT and the plans and specifications <br />must be submitted to the CWCB staff for verification of compliance with the terms of this contract <br />prior to bid opening. Any modifications to the plans and specifications must be approved in <br />writing by the CWCB staff. <br /> <br />c. For plans and specifications for all jurisdictional dams and reservoirs, as defined by ~ 37-87-105 <br />C.R.S. (1997), the BORROWER shall provide a letter of approval from the State Engineer's Office <br />prior to construction, <br /> <br />d. CWCB staff must be present at bid opening and must approve the award of the construction <br />contract <br /> <br />e. The BORROWER shall contract for the construction of the work with responsible and capable <br />firms, hereinafter referred to as CONSTRUCTION FIRMS, which CONSTRUCTION FIRMS shall be <br />selected by the BORROWER and found acceptable by the CWCB staff before work under this <br />contract begins. <br /> <br />f. The BORROWER must provide a copy of the executed construction contract documents consisting <br />of the advertisement for bid, contractor's proposal, construction contract, bid bond, performance <br />bond, payment bond, notice of award, notice to proceed, sample change order, and sample field <br />order, After the eWCB staff verifies that these documents comply with the terms of this contract, <br />the BORROWER may issue the notice to proceed to the CONSTRUCTION FIRMS. <br /> <br />g. The BORROWER shall conduct a pre-construction conference at which time the CWCB staff shall <br />have the opportunity to review and approve the construction schedule. <br /> <br />h. If the CWCB staff determines that the PROJECT requires a resident inspector during construction, <br />the BORROWER shall employ an inspector who has been approved by the CWCB staff. <br /> <br />i. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br />specifications, <br /> <br />j, Upon completion of the PROJECT construction, the BORROWER shall provide as-built drawings of <br />the PROJECT to the CWCB staff, and, if required by ~ 37-87-105, C.R.S. (1997), the BORROWER <br /> <br />Farmers Pawnee Canal Company <br /> <br />Page 2 of 13 <br /> <br />Loan Contract <br />