Laserfiche WebLink
<br />" <br /> <br />", <br /> <br />AGENCY NAME: Water Conservation Board <br /> <br />AGENCY NUMBER: PDA <br />ROUTING NUMBER: <br /> <br />$22,250 <br /> <br />LOAN CONTRACT <br /> <br />THIS CONTRACT, made this If? 13- day of _ ')/1 "-\~ 1998, by and <br />between the State of Colorado for the use and benefit of the Department of Natural Resources, Colorado <br />Water Conservation Board (CWCB), hereinafter referred to as the STATE, and The Farmers Pawnee <br />Canal Company, 16177 CR 24, Sterling, Colorado 80751, hereinafter referred to as the BORROWER <br />and/or CONTRACTOR. <br /> <br />FACTUAL RECITALS <br /> <br />1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund <br />Number 424, Organization YVYY, Appropriation SPL, GBL F825, Program WTRC, Object Code <br />5120, Reporting Category: 3825, Contract Encumbrance Number C153825. <br /> <br />2, Required approval, clearance, and coordination have been accomplished from and with appropriate <br />agencies, <br /> <br />3, Pursuant to the provisions of 99 37-60-119 and 37-60-120, C.RS, (1997) the STATE is authorized to <br />loan money for the construction of water projects for the benefit of the people of the STATE, provided <br />that the borrower assures repayment of that money. <br /> <br />4. Section 37-60-122.7, C,R.S. (1997) authorizes the STATE to make loans of up to $100,000 <br />from the Small Project Loan Account of the Construction Fund without prior approval from the <br />General Assembly if the STATE determines that delay would result in undue hardship on the <br />borrower. <br /> <br />5, The BORROWER is a duly constituted Colorado ditch and reservoir company govemed by 99 7-42- <br />101 et seo. and 7-40-101 et seo., C.RS" located in Logan County, State of Colorado, <br /> <br />6, The BORROWER has applied to the STATE for a loan in the amount of $29,000 to be used for <br />rehabilitating its diversion dam and head gate on the South Platte River, hereinafter referred to as <br />PROJECT, at a cost of $110,000. <br /> <br />7. The STATE has reviewed a feasibility report, prepared by Famsworth & Polk of Aurora, Colorado, <br />dated May 7, 1998, which is incorporated herein by reference, and, based upon this feasibility report, <br />the STATE determined the PROJECT to be technically and financially feasible, <br /> <br />8, This loan qualifies as a Small Project Loan under ~ 37-60-122.7, C,R.S, (1997), because the <br />amount of the loan does not exceed $100,000 and the BORROWER will suffer undue hardship if <br />the PROJECT is not completed prior to the 1998 spring runoff because, without completion of <br />the PROJECT, high water may cause the diversion dam and head gate to fail completely, <br /> <br />Farmers Pawnee Canal Company <br /> <br />Page 1 of 13 <br /> <br />Loan Contract <br />