Laserfiche WebLink
<br />..-, ~ <br /> <br />1. Any portion of the work performed by Western Engineers such as piezometer <br />installation or seepage control features would not require additional inspection and <br />the associated costs shown herein wonid be reduced. <br /> <br />2. The options and related estimated costs for further study and/or relm~diation <br />presented in this letter are preliminary based on limited information. It must be <br />recognized that they may vary based on plans and decisions made by Silt weD or <br />the Colorado Division of Water Resources, Dam Safety. <br /> <br />3. There may be costs not estimated in this letter. For example, if existing voids are <br />identified or suspected after performance of work described above, there will be <br />additional costs associated with characterization and remediation of those voids. <br /> <br />Thank you again for the opportUnity to assist you with this project. Please let me know if <br />you have any questions Of need additional infonnation. <br /> <br />Submitted by: <br /> <br />C ~:::E~~~~~ <br /> <br />Bruce D. MaI'\4n P.E. <br /> <br />FAX copy: John Blair, P.E., Colorado Division of Water Resources <br /> <br />" <br />