My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00024
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:47 AM
Creation date
10/6/2006 12:02:03 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153446
Contractor Name
Grand Mesa Water Conservancy District
Water District
0
County
Delta
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1985 <br /> <br />October 21 <br />November 11 <br />November 11 <br />November 18 <br /> <br />December 9 <br /> <br />1986 <br /> <br />January 6 <br />January 13 <br />January 26 <br />February 3 <br /> <br />Start of Work on Task No.6 <br />Start of work on Task Nos. 7, 9 and 10 <br />Submit written Progress Report No.3 <br />Start of work on Task No.8 <br /> <br />S,:-!bmit written Progress Report No. 4- <br /> <br />Submit written Progress Report. No.5 <br />Submit draft Final Report to CWCB for reyiew <br />Rec~ive CWCB's comments on draft report <br />Submit printed copies of Final ReporttO':CWCB <br /> <br />Section IJ: Work Tasks <br /> <br />Our proposed plan for accomplishing the study has been divided into ten <br />general work tasks as fol1ows which substantially conform to the order of the study <br />given in the RFP; <br /> <br />Task No. <br /> <br />I <br /> <br />Task Title <br /> <br />Preparation and Approval of Inception Report. <br /> <br />2 Evaluation of Operation of Existing Surface Creek Water Supp~y <br />System. <br /> <br />3. Analysis of Potential Water Rights Exchanges in Surface Creek Water <br />Supply System; <br /> <br />4- Estimate of Water Available for Storage in New Project Reservoir.' <br /> <br />5 Evaluation of Operation of Existing Overland Ditch and Reservoir <br />System. <br /> <br />6 Estimate of Excess Water Supplies in the Overland Ditch and <br />Reservoir System A vallable for Transbasin Diversion. <br /> <br />Revised 8/15/1985 <br /> <br />/ <br /> <br />1I-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.