My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00024
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:47 AM
Creation date
10/6/2006 12:02:03 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153446
Contractor Name
Grand Mesa Water Conservancy District
Water District
0
County
Delta
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />generation efforts which w~uld require substantial commitments of either ~ime or <br />expense, such as installation of stream or diversion gauging stations, geologic <br />foundation drilling or seismic testing. <br /> <br />, <br />We propose to use a 15-year study period of water years 1969 to 1984, <br />inclusive, if the retords for water year 1984 are available by the tirrte required for <br />the study. If not, the study period would cover water years 1968 to 1983, indusive. <br />This period is believed to be statistically representativ~ of a. 30-year or longer <br />hydrologic record and contains both the extreme low (J 977) and high (1983) years of <br />record in the study basins. <br /> <br />Section 3: The Work Schedule <br /> <br />Figure II-I presents our proposed schedule for the study. The work schedule <br />shown is based on an assumed contract starting 'date for the study of August 15, <br />1985. During the last two weeks of August, the detalled proforma for the study <br />woul~ be established in conjunction with the eWCB staff~ W,ork on Steps One and <br />Two of the CWCB study plan would start September 3, 1985 and the approved final <br />. . <br />report would be delivered to the eWCB by February 3,"1986, resulting in an elapsed <br />time of five and one-half months. to complete the study. <br />A tentative schedule of the major study events is as follows: <br /> <br />1985 <br /> <br />August 15 <br />August 19 <br />September 3 <br /> <br />September 16 <br />October ]. <br /> <br />October 14 <br />October 14. <br /> <br />Revised 8/15/1985 <br /> <br />I <br /> <br />Study Schedule Milestones <br /> <br />Contract starting date <br /> <br />In,itiate work on study <br /> <br />Completion and approval of Inception Report (Task No; 1) and <br />start of work on Task Nos. 2 and 5 <br /> <br />Submit written Progres:5 Report No.1 <br /> <br />Start of work on Task No.4 <br /> <br />Start of work on Task Nos. 3 and 11 <br /> <br />Submit written Progress Report No.2 <br /> <br />11-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.