Laserfiche WebLink
<br />., <br /> <br />cXIlIillT f\ <br /> <br />SCII[;lJUI.I, ^ <br />CQLOfU..UO Wl\Tlm CON:,I':UV^TION 1l0^'W <br />CONSTRUCTION FOND PHOWIAM PIWCEI)Uill~5 <br /> <br />1. Board approval oC engineoriny Cirm and engineering <br />agreement between engineering (irm clod prolect sponsor. <br /> <br />2. Preparation of detailed plans and specieications for <br />authorized projects by conSUlting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications (or storage dams and <br />reservoirs must also be approved by State Engineer's <br />office). <br /> <br />4. Board staff approval of bidding tor the project. Board <br />staff present at bid opening for construction. <br /> <br />5. Project sponsor may issue the notice of award and the <br />notice to proceed with construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />6. Conduct a pre-construction conference. Approval oC <br />construction schedule by Board staff. <br /> <br />7. Construction commences. The Board staCf makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board sta[f in advance and be(or~ any <br />construction on change items can commence. Emeryency <br />items cleared by telephone. <br /> <br />8. The conSUlting engineer certifies that the project lIas <br />been completed according to approve!) drawillgs Blld <br />specifications and arrangeR for [~[Ial tllspectil)n. <br /> <br />9. Final inspection and acceptance o( as-Llliit project by <br />Board staff. <br /> <br />10. Submittal of as-blJilt drawirlgs to nnard atafE (ot <br />approval and filing. <br /> <br />EXHIBIT B <br /> <br />1588E <br />