My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00553
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:28 AM
Creation date
10/6/2006 12:01:22 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0022X
Contractor Name
West Anvil Water & Power Company
Contract Type
Loan
Water District
0
County
Garfield
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />2. Dam Stability <br />The stability of several possible proposed dam sections was <br />eva luated with respect to bearing capacity, overturning about <br />the toe, sliding along the base, and uplift. Once these factors <br />had been considered, a preliminary design section for the dam <br />was se lected. <br /> <br />. <br /> <br />A roller-compacted concrete dam section with its foundation at <br />an elevation of 5,168 ft, crest at an elevation 5,256 ft, <br />maximum normal pool at an elevation of 5,250 ft, and downstream <br />pool at an elevation of 5,180 ft, was assumed. The proposed dam <br />had a 20-ft crest width, a 1:24 (horizontal:vertical) upstream <br />face slope, and a 1:0.6 downstream face slope. This preliminary <br />study has assumed that only 4 ft of freeboard is available at <br />the maximum pool elevation. It is expected that additional <br />freeboard will be required; however, because additional <br />freeboard improves stabil ity, a minimum freeboard was used in <br />the preliminary analysis. <br /> <br />A detailed analysis was conducted to evaluate the stability of <br />the selected section. This analysis was a static analysis and <br />considered hydrostatic and earth pressures on both the upstream <br />and downstream faces of the dam, as well as bearing, uplift, and <br />frictional forces along the base of the dam. The dam was <br />checked for stabil ity with the reservoir both full and empty. <br />Results of the analysis are summarized in Table IV-I. <br /> <br />While this is not a complete analysis sufficient for final <br />design, it does indicate that few, if any, problems will be <br />encountered in maintaining stability at this site. The selected <br />section proved to be quite good in that the resultant force for <br />the full-reservoir case has a resultant line of action with an <br />eccentricity of less than 1 ft from the centroid of the base of <br />the dam. <br /> <br />. <br /> <br />3686-a/8 <br /> <br />IV-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.