Laserfiche WebLink
<br /> TABLE OF CONTENTS <br />. (Continued) <br /> Section Title Page <br /> VI PROJECT GENERAL ARRANGEMENT VI-l <br /> A. General VI-l <br /> B. Dam VI-l <br /> C. Spi 11 way VI-2 <br /> D. Reservoir VI-2 <br /> E. River Channel Excavation VI-3 <br /> F. Power Conduit and Tailrace VI-3 <br /> G. Powerhouse VI-4 <br /> 1. Cr ane s VI-5 <br /> 2. Turbines VI-5 <br /> 3. Generators VI-6 <br /> H. Switchyard VI-7 <br /> I. Transmission Facilities VI-7 <br /> J. Access Road VI-B <br /> K. Elevated Railroad Embankment VI-B <br /> L. Elevated Interstate and Highway Embankment VI-B <br /> M. References VI-9 <br />. VII PROJECT COST ESTIMATE AND SCHEDULE VII-l <br /> A. General VII-l <br /> B. Basis of Cost VII-l <br /> 1. Phase II Cost Estimate VII-3 <br /> 2. Phase II I Cos t Estimate VII-3 <br /> C. Project Schedule VII-5 <br /> D. Constructability VII-6 <br /> 1. Cofferdam VII-7 <br /> 2. Highway VII-B <br /> VIII ECONOMIC AND FINANCIAL ANALYSIS VIII-l <br /> A. Introduction VIII-l <br /> B. Capital Costs VII 1-2 <br /> 1. Escalation VIII-3 <br /> 2. Interest During Construction V II 1-4 <br /> 3. Work i ng Capital VIII-4 <br /> 4. Replacement Reserve VI II-4 <br /> 5. Debt Service Reserve V II 1-4 <br /> 6. Financing Cost VIII-5 <br /> C. Annual Costs VIII-5 <br /> 1. Operation and Maintenance VIII-5 <br /> 2. Replacement VIII-6 <br /> 3. Property Tax and Insurance VIII-6 <br />. 4. General and Administrative VIII-6 <br /> <br />36B6-a/4 <br /> <br />i i i <br />