Laserfiche WebLink
<br />. TABLE OF CONTENTS <br /> (Continued) <br /> Section Title Page <br /> D. Future Water Development 11-4 <br /> 1. Water Rights Applicable to <br /> Webster Hill Reservoir 'II-5 <br /> 2. Development of the Scenarios II-6 <br /> a. Future Upstream Depletions II-6 <br /> b. Future Downstream Demands II-9 <br /> c. Minimum Stream Flow II-IO <br /> E. Firm Water Yield II-ll <br /> F. Summary II-17 <br /> III PROPOSED RESERVOIR OPERATION III-I <br /> A. General III-I <br /> B. Reservoir Operation Schedule III-I <br /> C. Bypass Outlet I II-3 <br /> D. Gated Spi 11 way III-4 <br /> E. Power Generation III-7 <br /> F. Active Storage Releases III-8 <br />. IV SUMMARY OF GEOTECHNICAL FEASIBILITY STUDY IV-I <br /> A. General IV-I <br /> B. Site Geology IV-I <br /> C. Field Investigation IV-2 <br /> D. Laboratory Investigation IV-4 <br /> E. Preliminary Feasibility Evaluation IV-4 <br /> 1. Water Retention Ability IV-5 <br /> 2. Dam Stability IV-6 <br /> F. Availability of Construction Materials IV-8 <br /> G. Conclusion IV-9 <br /> V POWER PRODUCTION STUDIES V-I <br /> A. General V-I <br /> B. Input Data V-I <br /> 1. Monthly Stream Flows V-I <br /> 2. Available Head V-2 <br /> 3. Plant Configuration V-2 <br /> C. Energy and Capacity Output V-6 <br /> <br />. <br /> <br />3686-a/4 <br /> <br />i i <br />