My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00553
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:28 AM
Creation date
10/6/2006 12:01:22 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0022X
Contractor Name
West Anvil Water & Power Company
Contract Type
Loan
Water District
0
County
Garfield
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />WEBSTER HILL RESERVOIR AND HYDROPOWER PROJECT <br /> <br />SUMMARY OF PROJECT PRINCIPAL DATA <br /> <br />Basin Hydrology <br />Drainage Area Above Dam (sq mi)......................... <br />Maximum Calculated Flow at Dam Site (cfs)............... <br />Annual Average Calculated Flow at Dam Site (cfs)........ <br />Minimum Calculated Flow at Dam Site (cfs)............... <br />Probable Maximum Flood (PMF) at Dam Site (cfs).......... <br />Inflow Design Flood (IDF) at Dam Site (cfs)............. <br /> <br />e <br /> <br />Reservoir <br />Normal Reservoir Pool Elevation......................... <br />Maximum Reservoir Pool Elevation During IDF............. <br />Maximum Reservoir Pool Elevation During PMF............. <br />Minimum Power Pool Elevation............................ <br />Minimum Reservoir Elevation............................. <br />Reservoir Area at Normal Pool (acres)................... <br />Fetch Length of Reservoir (miles)....................... <br />Gross Storage Capacity (ac-ft).......................... <br />Active Storage Capacity (ac-ft)......................... <br />Firm Water Supply Yield (ac-ft/yr)...................... <br /> <br />6983 <br />36,000 <br />3,438 <br />866 <br />123,500 <br />41,800 <br /> <br />5,250 <br />5,255 <br />5,266 <br />5,220 <br />5,220 <br />915 <br />3.6 <br />23,730 <br />20,000 <br />20,000 <br /> <br />Project Power Data <br />Installed Capacity (MW)................................. 23 <br />Maximum Output (MW)..................................... 26.4 <br />Scenario II: Minimum Annual Energy (kwhxl06)........... 82.4 <br />Scenario II: Average Annual Energy (kwhxl06)........... 111.0 <br />Scenario II: Maximum Annual Energy (kwhxl06)........... 126.0 <br /> <br />Dam <br /> <br />Type: Concrete Gravity <br />Crest Elevation (ft, msl)............................... 5,256 <br />Crest Length (ft)....................................... 1,300 <br />Height Above Foundation (ft)............................ 88 <br /> <br />Dam Equipment <br />Crane: Monorail w/Structural A-Frame Supports <br />Location: Top of Dam Above Powerhouse <br /> <br />Capac i ty (tons)......................................... 5 <br />Length (ft) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 200 <br /> <br />e <br /> <br />3686-a/3 <br /> <br />S-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.