My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00553
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:28 AM
Creation date
10/6/2006 12:01:22 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0022X
Contractor Name
West Anvil Water & Power Company
Contract Type
Loan
Water District
0
County
Garfield
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />with appropriate mitigative measures will take time, but will ensure <br />that the Webster Hill project is environmentally sound. <br /> <br />CONCLUSION AND RECOMMENDATION <br />The Webster Hill Reservoir and Hydropower Project is technically, <br />economically, and environmentally feasible under the design concepts <br />and assumptions detailed in this report. <br /> <br />It is recommended that Phase II begin immediately to obtain the <br />hydropower license and other needed permits. At the same time, <br />negotiations for the acquisition of land, the sale of power and <br />water, the relocation of railroads and highways, construction <br />financing, and permanent project financing should be pursued. Con- <br />current with these efforts, all necessary geotechnical, water <br />exchange studies, and other engineering work should be continued. <br /> <br />. <br /> <br />. <br /> <br />3686-a/3 <br /> <br />S-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.