My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00549
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00549
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2011 3:02:57 PM
Creation date
10/6/2006 12:01:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153618
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />(. <br /> <br />"', i <br /> <br />EXf!IBIT A <br /> <br />rM <br /> <br />\ ,I <br /> <br />CITY OF GREElEY <br />FEASIBILITY STUDY FOR REHABILITATION OF ro4ANCHE DAM, PETERSON DAM AND <br />lVIN LAKES DAM <br />SCOPE OF SERVICES <br /> <br />C:i:ro'uc i'lii;.;:..'i'::"~Sl.iCJ <br />, ~3.1'iM OG1f~Olro <br />r _.:.. . . )\)r <br />1'"1, ..C]. '. h: <br /> <br />~l{~~~(;!J~~ <br />A separate feaSibility study and report will be prepared for Comanche Dam, <br />Peterson Dam and Twin Lakes Dam. At the request of the Colorado Water <br />Conservation Board, Tasks 3 through 11 of the scope of services have been <br />fomatted in accordance with the ewCB outline for feasiblity study reports as <br />shown in the ewCB Guidelines. <br /> <br />GENERAL <br /> <br />The feaSibility reports wi.ll be prefctced by the following infonuation, most of <br />which will be gen~rated by work performed under task 2. <br /> <br />- Title page <br />- Letter of Transmittal <br />- Resolution of Applying Organization <br />- Table.of Contents <br />- List of Maps and Exhibits <br />- List of References <br />- Proj ect SlIIIIIIary <br />- Conclusions and Recommendations <br /> <br />Tasle 1 - Project Procedures Manual <br />Prior to starting on any worle on this Contract, the Project Manager shall <br />prepare a Project Procedures Manual in accordance with MKE policy. The <br />procedures manual shall describe the work program, project organization, <br />communications, administration and accounting.. A copy of the procedures <br />manual shall be made available to the City and the Colorado Water Conservation <br />Board for reference. <br /> <br />EXHIBIT A - Feasibility Study <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.