My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00545
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00545
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/6/2006 12:00:56 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153373
Contractor Name
Basalt, Town of
Contract Type
Loan
Water District
37
County
Eagle
Bill Number
SB 78-69
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SCHEOULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. Board approval of engineering fIrm dnd engineering <br />agreement between engineering fIrm dnd project sponsor. <br /> <br />2. Preparation of detailed plans dnd spe~lflcatlons for <br />authorized projects by consulting engineering fIrm. <br /> <br />3. Approval of detailed plans dnd specifications by Board <br />staff (plans dnd specifications for storage dams dnd <br />reservoirs must dlso be approved by State Engineer's <br />office). <br /> <br />4. BOdrd staff approval of bidding for the project. Board <br />staff present at bid opening for construction. <br /> <br />5. <br /> <br />Project sponsor may iS$ue the notice of award and the <br />notice to proceed with construction to tne contractor <br />(both notices must be approved by the Board staff before <br />they are issued). <br /> <br />6. <br /> <br />Conduct a pre-construct Lon con <br />construction schedule by BOd <br /> <br /> <br />~~~' >, <br />ere*c.e'., A.ppro'ial of <br />taf;\,". <br />:, '1:::-" <br />~~.~~,~)lff makes periodic <br />~f change orders must <br />~~dvance and before any <br />commence. Emergency <br /> <br />7. <br /> <br />Construction commendes. . <br />lnspections during construel <br />be approved by the Bard sta <br />construction on chdn ems c <br />items cleared by tele ~1t~':k.''''~~ <br /> <br /> <br />~r~ <br />ee '/ce~ifies that the project <br />din ~ 0 approved drawings dnd <br />rra ges for final inspection. <br /> <br /> <br />has <br /> <br />8. <br /> <br />The consult!n <br />been camp 1 e <br />specifications <br /> <br />9. <br /> <br />Final inspection <br />BOdrd staFf. <br /> <br />acceptance of as-buIlt project by <br /> <br />10. Submittal of as-built drawings to Board staff for <br />approval and fILIng. <br />
The URL can be used to link to this page
Your browser does not support the video tag.