My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00544
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00544
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2011 10:23:54 AM
Creation date
10/6/2006 12:00:53 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153609
Contractor Name
Conejos Water Conservancy District
Contract Type
Loan
Water District
22
County
Conejos
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />� <br />Case ho. 2111 <br />Page 3 <br />IT is FURTHER ORDERED that the official acts of each Officer <br />and Director, on behalf of the Conejos Water =onservancy District, <br />taken in the intervening period subsequent to the expiration of the <br />respective term of each, and prior to the within appointment, <br />should be, and the same hereby are confirmed and approved. <br />IT IS FURTHER ORDERED thaC each member of said Board shall <br />receive as compensation for his service such sum as shall be set by <br />the Board, not to exceed $25 per meeting, plus $6 per hour for <br />services actually performed for the District, up to a maximum of <br />eight (e) hours per day, but in no event to exceed $1,200 per <br />annum, together with necessary traveling expenses actually incurred <br />while in the performance.of their duties on behalf of the District. <br />Dated: �,�(�T(g¢2� <br />SY THE COi7R� <br />District Court �s�e <br />Twelfth Judicial District <br />
The URL can be used to link to this page
Your browser does not support the video tag.