Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />r <br />! <br /> <br />1:52 No.002 P.02 <br /> <br />Sep eIIt <br /> <br />~-303-327-~770 <br /> <br />Martin Rgency Inc. <br /> <br />. <br /> <br />~olorado Water ConBerv~tion Board <br />SeptemDer 12, 1994 <br />[';:.ge 2 <br /> <br />The FWDC Board has exp!~ssed concerns <br />storage or wintp-r releases in the Curley. <br />in direct violation of their bylaws. <br /> <br />over allowing us winter <br />Both of Lhe6e items are <br /> <br />Although wint"r <br />hictorically allowe~, <br />or f"Yrn~l agreements. <br /> <br />storage and winter releases hav~ been <br />~WDC does not wish to enter into permanent <br /> <br />The alternate, briefly ouLlined in our 1991 FeaslhlJlty Study <br />is to build our own winter storage. We began "orne I'Lellmlnary <br />work in this re9dL~, and were preparing to mOVe forward with a 10 <br />million 9allon reservoir project. <br /> <br />Recently, however, We Leceived a letter trom FWnc Informing us <br />that the Guy] AY Reservoir may be completely draille~ this winter due <br />to drought conditions. it this """urred, our historical winter <br />release would be imp05sible, and Lhe water system may b.. without <br />water. <br /> <br />nealing with this very critical siLu"tion, the NWt: realizes WA <br />Cdnnot rely on the h Istor I "" J 9oodw1l1 of FWDC, ~nd muat "eCUre uur <br />own adequ~te winter bUl'l'ly very expeoitiously. We need to <br />construct a 30 million gallon reecrvoir, and do 1L expeditiously. <br />We need to con5Lruct a 30 million gallon reservoir, and do 50 by <br />th.. 1995-96 winter Bc;:>eon. This proj~ct is urgent. <br /> <br />We need a more complete stUdy to buUd th.. 30 mUlion gallon <br />reservoir. This study is estim;:.ted to co~t $25,000. we would iike <br />to reque8L a ~5,000 grant from thp Small Oam Site Roconnaissance <br />Program and a loan in the amounL of ~7,500. we will fund half of <br />the stuOy. <br /> <br />Wp would also requect approaching your board in November for <br />addlliona1 funOing tor the project. We ..,i11 need "n "dditional <br />$580,000 to build "n adequate winter supply storage rQlIervoir. <br />Tnis is over ~nd above the $320,000 "uthorized in 1993. <br /> <br />While the Fe;:>cibility Stu~y will not be complete hy November <br />3, 1994, an outline of the project addreGsing major la~ue5 can be <br />completed for that rn~~ting. <br /> <br />We will need to be unoer contract for the new otudy a~ aoon aa <br />possible in order to meet with yvu in NOVember. <br />