Laserfiche WebLink
<br />. <br /> <br />d. Water Rights <br /> <br />!l <br />U <br />":::t- <br />~ <br />~ <br /> <br />1. <br /> <br />As provided by the Owner, water rights, permits <br />and dates of priority will be included in the <br />report. <br /> <br />2. <br /> <br />As provided by the Owner, a probable yield of the <br />water rights will be included in the report. <br /> <br />f. <br />~ <br />.~ <br />" <br />~ <br /> <br />e. <br /> <br />Water Utilization <br /> <br />As the project under consideration is a rehabilitation <br />project, water utilization will remain relatively <br />unchanged. Therefore, the subject will not be covered <br />in the report. <br /> <br />f. Water Quality <br /> <br /> <br />The proposed project will not alter the water quality, <br />and this subject will not be covered in the report. <br /> <br />6. Chapter V, Plan of Development <br /> <br />a. Physical Plan - Only item 1 - Irrigation and item 6 - <br />Drainage as noted in CWCB Guidelines will be discussed <br />in the report. The other items are not applicable to <br />this project. <br /> <br />b. Geologic Investigations - Existing geologic data will <br />be used for the Feasibility Report. <br /> <br />c. Design - Items 1-6 as noted in CWCB Guidelines. <br />Design criteria and standards used will be described <br />in the Fessibility Report. Existing canals and other <br />appurtenances will not be analyzed. <br /> <br />~ <br /> <br />Items 7-14 as noted in CWCB Guidelines. These items <br />do not apply to this project and will not be a part of <br />the report. <br /> <br />'0 <br /> <br />d. <br /> <br />Structure Plans - 1 & 2. Preliminary plans of <br />proposed construction will be made a part of the <br />report. <br /> <br />e. Drainage ~ Other than drainage as it relates to the <br />watershed totally, it is not felt that this item <br />applies to this project. Drainage of the watershed <br />will be covered in other areas of the report. <br /> <br />f. Sedimentation - It is anticipated that the structure <br />outlet will need to be lengthened, with no change in <br />the upstream elevation. The report will not include a <br />study of sedimentation. <br /> <br />-3- <br />