<br />. <br />" <br /> <br />. <br /> <br />. <br /> <br />- <br />2. "Mountain Home Reservoir, Spillway Improvements, Geotechnical <br />Investigation", by Davis Engineering, February 29, 1988 <br /> <br />The total project cost Including construction, engineering, legal fees, and <br />contingencies Is estimated at $824,525, 'rhe brealcdown of the cost Is as follows, <br /> <br />1. Dam Fill <br />2. Dam Rlprap <br />3. Spillway <br />Excavation <br />Fill <br />Rlprap <br />4, Grout Abutment <br /> <br />12,000 CY @ $2.75 <br />800 CY @ $20,00 <br /> <br />$ 33,000 <br />$ 16,000 <br /> <br />82,000 CY @ $4,00 <br />31,000 CY @ $2,76 <br />1,100 CY @ $20,00 <br />10,000 LF @ $15,00 <br /> <br />$328,000 <br />$ 85,260 <br />$ 22,000 <br />$150,000 <br /> <br />TOTAL <br /> <br />$634,260 <br />$190,275 <br /> <br />$824,525 <br /> <br />SUBTOTAL <br />ENGINEERING, LEGAL FEES, CONTINGENCIES @ 30% <br /> <br />Please be advised that this estimate Is based on the above reports and we can <br />only accept their Information on face value, We do have some questions as to <br />some of the Information In these reports and expect to consider alternatives not <br />considered by Davis, One area that Is unknown at this time Is the need to <br />grout the right abutment. The 1986 report Indicates this may be required, <br />however, ,the 1988 report makes no mention of the abutment seepage. Also,' we <br />do not belleve the Information concerning the need to remove the upper 50 feet <br />of the dam and did not Include this In the cost analysis listed above, <br /> <br />Due to' the questions not answered by the previous two' studies, we <br />recommend the Trlnchera Irrigation Company request project funding through the <br />Colorado Water Conservation Board for a total project cost of $1,000.000, <br /> <br />PROJECT SCHEDULE <br /> <br />Attached. 'at the end of this report Is a project schedule which was <br />developed assuming construction will begin In September 1993. This will provide <br />a schedule which shows the latest date the Feasibility Study and final engineer- <br />Ing design can take place and still start construction In 1993. <br /> <br />Mountain Home Reservoir Proposal <br />Page 4 <br />