My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00533
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00533
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153367
Contractor Name
International Engineering Company
Water District
0
County
Rio Blanco
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1-3 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />be formulat,~d using general water demands from the YJWCD, interested <br />municipalitil~s, and energy companies. <br /> <br />Study Organization and Management <br /> <br />The conduct of the study activities was the responsibility of IECO, with <br />study direct'ion and coordination provided by the CWCB. IECO subcontracted <br />with Western Engineers, Inc. of Grand Junction, Colorado for an analysis of <br />the water r'ights and preliminary design of the alternative delivery <br />systems. ThE' financial evaluation of the funding options was conducted by <br />the finance ciepartm~nt of Morrison-Knudsen Company, Inc. <br /> <br />The CWCB established a Yellow Jacket Advisory Committee to review and <br />comment on the products of the study and to provide comments on the conduct <br />and content of the study. The committee members were chosen based on their <br />knowledge of the resources in the White River Basin, their technical <br />expertise, or their interest in a potential water project for the area. The <br />members of the Advisory Committee are shown in Section B of the Appendix. <br />
The URL can be used to link to this page
Your browser does not support the video tag.