My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00532
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/5/2006 11:59:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br />STATE OF COLORADO <br /> <br />o <br /> <br />COLORADO WATER CONSERVATION BOARD <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver. COlorado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 8_74 <br /> <br />Roy Romer <br />Governor <br /> <br />MEMORANDUM <br /> <br />Ken Salazar <br />Execu'!i~ DirectOr <br /> <br />Caries C, Ule, P,E, <br />Division Direaor <br /> <br />TO: <br /> <br />Bill Hill <br /> <br /> <br />FROM: <br /> <br />Keith Eberhar t <br /> <br />DATE: <br /> <br />December 3, 1992 <br /> <br />SUBJECT: <br /> <br />Contract Increase - $98,424 <br />Barnes Meadow Reservoir <br />City of Greeley, Colorado <br /> <br />Barnes Meadow Reservoir was authorized for $215,000 of funding from the <br />Construction Fund in Senate Bill $5, 198t;J, Senate Bill ~ authorized the increase of <br />the initial amount for this project by "plus or minus such amounts, if any as may be <br />justified by reason of ordinary fluctuation in construction costs as indicated by the <br />engineering cost indices applicable to this type of construction involved for such <br />projects or by reason of changes made in the plans if those changes are required by <br />final engineering drawings and specifications or by Federal or State requirements." <br /> <br />The engineering cost indices have increased by 12 percent for this project and <br />CWCB cost share is $27,900, Under the second phrase above, the Board is authorized <br />to increase the original amount by $70,000 due to the increased in the scope of the <br />project due to items required by the State Engineer's Office in the final design of the <br />project. <br /> <br />GKEjbj <br /> <br />bj 843.memo <br />
The URL can be used to link to this page
Your browser does not support the video tag.