Laserfiche WebLink
<br />. <br /> <br />. <br />STATE OF COLORADO <br /> <br />o <br /> <br />COLORADO WATER CONSERVATION BOARD <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver. COlorado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 8_74 <br /> <br />Roy Romer <br />Governor <br /> <br />MEMORANDUM <br /> <br />Ken Salazar <br />Execu'!i~ DirectOr <br /> <br />Caries C, Ule, P,E, <br />Division Direaor <br /> <br />TO: <br /> <br />Bill Hill <br /> <br /> <br />FROM: <br /> <br />Keith Eberhar t <br /> <br />DATE: <br /> <br />December 3, 1992 <br /> <br />SUBJECT: <br /> <br />Contract Increase - $98,424 <br />Barnes Meadow Reservoir <br />City of Greeley, Colorado <br /> <br />Barnes Meadow Reservoir was authorized for $215,000 of funding from the <br />Construction Fund in Senate Bill $5, 198t;J, Senate Bill ~ authorized the increase of <br />the initial amount for this project by "plus or minus such amounts, if any as may be <br />justified by reason of ordinary fluctuation in construction costs as indicated by the <br />engineering cost indices applicable to this type of construction involved for such <br />projects or by reason of changes made in the plans if those changes are required by <br />final engineering drawings and specifications or by Federal or State requirements." <br /> <br />The engineering cost indices have increased by 12 percent for this project and <br />CWCB cost share is $27,900, Under the second phrase above, the Board is authorized <br />to increase the original amount by $70,000 due to the increased in the scope of the <br />project due to items required by the State Engineer's Office in the final design of the <br />project. <br /> <br />GKEjbj <br /> <br />bj 843.memo <br />