Laserfiche WebLink
<br />I <br /> <br />Woodward.Clyde ConsuRants <br /> <br />I <br /> <br />I <br /> <br />Tobie 6-3 <br />Construction Cost Estimate <br />Alternative 3 (selected alternative) <br /> <br />I <br /> <br />I <br /> <br />Item Quantity Units Unit Cost Cost <br />Excavation 26000 cy $1.50 $39.000 <br />Embnnkmcllf Fill 26000 cy $5.00 $130.000 <br />Riprnp 1300 cy $10.00 $13.000 <br />Bedding MfltcriCll 500 cy $12.00 $6.000 <br />Sand DTilin 1500 cy .$12.00 $18.000 <br />SIB Wflll 2000 sf $5.00 $10.000 <br />Cut-Off Collar 15 cy $375.00 $6.000 <br />Toe Drain 550 ft $10 $6.000 <br />Piezometers 1 LS $6.000 $6.000 <br />r...1Ollllmcnls 1 LS $7.000 $7.000 <br />Surveys I LS $5.000 $5.000 <br />As-Built Drawings I LS $7.000 $7.000 <br /> Item Totn] $253.000 <br />Moh/Dcmob (8 %) $20.000 <br />Construction Observation (J29f) $30.000 <br /> Sub Totnl $303.000 <br />Contingency :10% $100.000 <br /> Grand TolAl $403.000 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />D",ugl~s ~"SQrVC'lr >>CC Il",. n"J9 <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />.1 <br /> <br />I <br /> <br />I <br /> <br />I <br />