Laserfiche WebLink
<br />I <br /> <br />Woodward.Clyde ConsuRants <br /> <br />I <br /> <br />Table 6-1 <br />Construction Cost Estimate <br />Alternative 1 <br /> <br />I <br /> <br />I <br /> <br />Item Quantity Units Unit Cost Cost <br />CIS Wall 14000 sf $15.00 $210.000 <br />Toe Drain 600 ft $10 $6.000 <br />Piezometers I LS $6.000 $6.000 <br />Monuments 1 LS $7.000 $7.000 <br />Surveys I LS $5.000 $5.000 <br />As-Built Drawings I LS $7.000 $7.000 <br /> Item Total $241.000 <br />MoblDcmoh (8 %) $19.000 <br />Construction Observation (12 %) $29.000 <br /> Sub T olal $289.000 <br />Contingency 30% $87.000 <br /> Grand Total $376.000 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />T.ble 6-2 <br />Construction Cost Estimate <br />Alternative 2 <br /> <br />I <br /> <br />Item Quantity Units Unit Cost Cost <br />Excavation 4800 cy $1.50 $6.000 <br />Fm 8500 cy $5.00 $42.500 <br />Riprap 3200 cy $10.00 $32.000 <br />Bedding Mntcrial 1300 cy $12.00 $16.000 <br />CIS Wall 9000 sf $10.00 $90.000 <br />Filter Mntcrilll 720 cy $12.00 $9.000 <br />T DC Drain 550 ft $10 $6.000 <br />Piezometers 1 LS $6.000 $6.000 <br />MOlluments 1 LS $7.000 $7.000 <br />Surveys I L5 $5.000 $5.000 <br />As-Built Dr[lwings I LS $7.000 $7.000 <br /> Item Total $226.500 <br />Moh/Demoh (8 %) $18.000 <br />ConstrLlction Observation (] 2 % ) $27.000 <br /> I Sub Total $271.500 <br />Contingency 30% $82.000 <br /> GTfllld Total $353.500 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />wee No. 22~3~ <br /> <br />I <br /> <br />I <br /> <br />I <br />