My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153664 Engineering report
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153664 Engineering report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/5/2006 11:59:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153664
Contractor Name
Fort Lupton, City of & Fort Lupton Water Utility Enterprise
Contract Type
Loan
Water District
1
County
Weld
Bill Number
HB 93-1273
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />maintenance expenses for the actual quantity of water that Hudson uses. The <br />revised budget information contained in this PER .'\mendment :--io. 2 retlects income <br />from Hudson for treatment charges as well as expenses for treating water that is <br />delivered to Hudson. The sum of these revenue and expense items are zero. <br /> <br />C. Revised Budget Information <br />Budget and cash llow projections have been revised to rellect revisions <br />requested by FmHA and to update the latest funding information. This <br />information is shown in Tables 1 through 4. The revisions and updated information <br />include the following: <br /> <br />. Receipt of an $11.5 million FmHA loan at a 5.25 percent interest rate <br />for a 40 year loan period, as well as a $7.5 million FmHA grant. Refer <br />to Line 7 of Table 2. <br /> <br />. Receipt of a $4.223 million Colorado Water Conservation Board loan at <br />a 2 percent interest rate for a 40 year loan period. Refer to Table 2, <br />Line 6. <br /> <br />. The cost of Fort Lupton's exclusive rights to 8 cfs of capacity in the <br />Southern Water Supply Project is shown as a connection fee since Fort <br />Lupton will not own the raw water pipeline. Refer to Line 8 of Table 3. <br /> <br />. The addition of $901,100 in WTP and raw water storage capital costs to <br />accommodate the water storage and treatment capacity that will be <br />dedicated to the Town of Hudson. Refer to Lines ](J and 12 of Table 3. <br /> <br />. The addition of $901,100 in connection fees from the Town of Hudson <br />to cover the capital costs for the expansion of the WTP and raw water <br />storage for the capacity in these facilities that will be dedicated to the <br />Town of Hudson. Refer to Line 3 of Table 2. <br /> <br />. The operating budget reflects operation and maintenance costs that will <br />be attributable to the Town of Hudson for treating the water that will be <br />delivered to Hudson. Refer to Line 17 of Table 1. <br /> <br />. The operating budget rellects the income from Hudson that will be <br />collected to cover the operation and maintenance costs that is <br />attributable to the treated water that is delivered to Hudson. Refer to <br />Line 12 of Table ]. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.