My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153664 Engineering report
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153664 Engineering report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/5/2006 11:59:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153664
Contractor Name
Fort Lupton, City of & Fort Lupton Water Utility Enterprise
Contract Type
Loan
Water District
1
County
Weld
Bill Number
HB 93-1273
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Q, <br /> <br />'St..;OClSt.::C: ',va~er" s;;a] :7'.e3...."1 :'\-'.e :t'....:~':...:~ :;f ',vater acqt::re~ 3I'.d .::t3.;:'.-:1 ':~: <br />t..l-t~ Subdist::ct from :.'1e c:e\"e~cpment J::d conSL""uc!1on of ~l-:e \Viney Gap ?;c;e::~ <br />pursuant :0 applJcable s:ate 'aw. and wr.lch is deliverable to Subdis~ct <br />allottees. <br /> <br />2. <br /> <br />.-\fl)cat..:~!1 ~f Cap3.citv. <br /> <br />a. <br /> <br />s~.VS? Snte:;:r.se COVen3....'1:s L'lat .~:cttee shall have :.he perpet'..:aJ. ~xc:usi"'e <br />nght to 1.:se 5.16 millJon CPO of capacity In the PipeUne from Career ~a-'<e ,~ c.'1e <br />delivery pOi1't descr.bed in Schedule A attached hereto. upon c~mp:eucn of <br />cor.str~c:.:cn thereof. Allot:ee's water v.1U be delivered to Allottee by SWS? <br />Ente:-pr.se c.'1rQu~h the P'peU1'e at Allottee's request and on a year-r~1.:~d. <br />continUQ1.:S basis except for dlsrupuons specifically perrn.Jtted herein and <br />dlsrupuons resulting from emergencies. Allottee shall not have the r.ght to use <br />capaCity in the Pipeline allotted to any other Partlclpant wtthout the express <br />perrnJsslon of the Partlcipant whose capaCity Is being utilized. <br /> <br />b. <br /> <br />SWSP EnteI1'rise shall provide Allottee wtth eighty (80) days' prior WTitten notice <br />of any scheduled disruption in the delivery rights of Allottee described herein. <br />Such eighty (80) day notice shall Include the date scheduled for Initiation and <br />tennination of the disruption. Allottee shall respond wtthln thirty (301 days of <br />receipt of t..'1e eighty (801 day notice and such thirty (301 day response notice <br />shall notify SWSP Enterprise as to whether the disruption Is acceptable or <br />unacceptable. If the scheduled disruption Is unacceptable. Allottee shall state <br />conditions under which the disruption wouid be acceptable to Allottee and <br />provide a minimum disruption of seven (7) consecutive days. SWSP EnteI1'r.se <br />shall not proceed in permitting the scheduled disruption unless and unul :ssues <br />raJsed In the response notice have been addressed to reasonably assure <br />unlmpaJred delivery to Allottee's servtce users. <br /> <br />c. <br /> <br />Allottee's delJvery pOint from the Pipeline set out above and the minimum <br />hydraulJc elevation at the delivery point described In Schedule B shall not be <br />changed by the SWSP Enterprise wtthout the WTitten consent of Allottee. The <br />Allottee at its sole discretion may designate one or more alternate pOints for <br />delivery from Its delivery pOint described In Schedule A to another point <br />upstream on the Pipeline wtthout the consent of SWSP EnteI1'rise so long as the <br />change redeslgnation does not adversely affect the hydraulic characteristics or <br />operation of the P1pel\ne: provtded. however. Allottee shall pay all costs of <br />deSign. engineering. construction and adm\nJstratiDn of changing Its delJvery <br />pOint(s). <br /> <br />d. <br /> <br />In the event that the P1pel\ne. after completion of construction. has capacity <br />downstream of the Carter Lake Outlet Works Mod1flcation In excess of the <br />ln1t1a1ly allocated capacity ("Excess Capacity". Allottee shall have the peI1'etual. <br />exclusIVe right to use a pro rata share of the Excess Capacity at Allottee's point <br />of delJvery. The Allottee's pro rata share of the Excess Capacity shall be the <br />Allottee's percentage of the total Individual Segment Specific Costs and :-Ion- <br />Segment Specific Costs of the Plpel\ne for all Segments downstream of the <br />Carter Lake Outlet Works ~od1flcation. In addition. If Allottee Is entitled to a <br />pro rata share of the Excess Capacity. Allottee shall have the peI1'etual. <br />exclusive right to use a sufficient amount of additional capacity In the Carter <br />Lake Outlet Works Mod1flcation to utilize said Excess Capacity. Allottee's <br />peI1'etual. e.'CcJustve right to use Excess Capacity hereunder shall be at no <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.