My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00509
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153500
Contractor Name
San Miguel Water Conservancy District
Contract Type
Loan
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />PAGE <br /> <br />Letter of Transmittal <br />Table of Contents <br />List of Tables <br />List of Figures <br />Executive Summary <br /> <br />i <br />iii <br />iv <br />v <br /> <br />CHAPTER I - INTRODUCTION <br />Study Area <br />Study Participants <br />Background <br />Study Process <br />Public Information Program <br />Report Organization <br /> <br />1-1 <br />1-1 <br />1-2 <br />1-3 <br />1-3 <br />1-3 <br /> <br />CHAPTER II - STUDY AREA <br />Local Economy <br />Physical Characteristics <br />Existing Institutions <br /> <br />II-I <br />II-I <br />11-2 <br /> <br />CHAPTER III - WATER RIGHTS AND HYDROLOGY <br />Water Rights <br />Hydrology <br /> <br />III-I <br />III-3 <br /> <br />CHAPTER IV. WATER DEMANDS <br />Historical Water Use <br />Existing Cropping Pattern <br />Potential Cropping Pattern <br />Delivery Reliability Criteria <br />Irrigation Water Demands <br />Municipal and Industrial Water Demands <br /> <br />IV-l <br />IV-3 <br />IV.4 <br />IV-S <br />IV-S <br />IV-6 <br /> <br />CHAPTER V - DEVELOPMENT OF ALTERNATIVES <br />Identification of Project Elements <br />Selection of Project Elements <br />Formulation of Alternatives <br />Description of Alternative Project Configurations <br /> <br />V-I <br />V-2 <br />V-7 <br />V-7 <br /> <br />CHAPTER VI - EVALUATIONS OF ALTERNATIVES <br />Improvements in Irrigation Deliveries <br />Cost Estimates of Alternative Configurations <br />Alternative Financing Scenarios <br />Annual Costs and Unit Costs <br />Payment Capacity Analysis <br />Comparative Evaluations <br /> <br />VI-I <br />VI-4 <br />VI-7 <br />VI-8 <br />VI-lO <br />VI-13 <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.