My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00509
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153500
Contractor Name
San Miguel Water Conservancy District
Contract Type
Loan
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />@ <br /> <br />SOLlie EnQlneerinQ Corporation <br /> <br />Suite 200 <br />165 South Union <br />Lekewood, Coloredo 80228 <br /> <br />c:onsultlnQ enQlneers <br /> <br />303/987-3443 <br /> <br />Mr. Bill Green <br />Colorado Water Conservation Board <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br /> <br />February 2, 1988 <br /> <br />RE: Interim Report for the San Miguel Project Feaslblllty Study <br /> <br />Dear Bill: <br /> <br />We are pleased to submit this Interim Report for the San Miguel Project Feasibility Study, This report <br />summarizes the results of Phase One of the San Miguel Project Feasibility Study, Four preliminary <br />alternatives for increasing available water supplies and the San Miguel hydropower project were developed <br />and evaluated at a reconnaissance-level of detail. Preliminary hydrologic, geotechnical, engineering design <br />and cost studies were carried out to define project alternatives based on an approximate uniform level of <br />investigation, Estimated water yields and costs were defined and used to evaluate and compare the <br />alternatives, The results of the technical and financial evaluations presented in this report will serve as the <br />basis for a decision regarding Phase Two of the study, One of the alternatives may be selected for detailed, <br />feasibility-level analysis in Phase Two or, if none of the alternatives appear to be viable, the study will be <br />concluded with Phase One. <br /> <br />We greatly appreciated this opportunity to contribute to the evaluation of such important projects in the <br />State of Colorado. We look forward to future opportunities to be of service. <br /> <br />Sincerely, <br /> <br />BOYLE ENGINEERING CORPORA nON <br /> <br />~ <br /> <br /> <br />Daniel W. Boyd, P.E. <br />Project Manager <br /> <br />DWB/JFK/cec <br /> <br />DN-C47-IOO-1I <br />
The URL can be used to link to this page
Your browser does not support the video tag.