My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00509
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153500
Contractor Name
San Miguel Water Conservancy District
Contract Type
Loan
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Selection <br /> <br />Pro ect Elements <br /> <br />The secon step in developing project alternatives consisted of evaluating each project element in terms of its <br />contributio to meeting irrigation water needs, Irrigation requirements in the Norwood-Redvale (existing <br />irrigated lads) and the Lilylands-Dry Creek (existing irrigated lands and new lands in the Dry Creek basin) areas <br />were consi .ered, The project elements selected for further consideration on the basis of these evaluations are <br />listed in thi section with additional discussion of some of the elements provided. <br /> <br />The eleme ts found suitable for development to improve service to the Norwood-Redvale area are identified as <br />the followi g: <br /> <br />Identification <br />Cr vcr Creek Diversion to Gurley Ditch <br />W st Beaver Creek Diversion to Gurley Ditch <br />W st Beaver Highline Ditch to Gurley Ditch <br />Be vcr Creek Diversion to Gurley Ditch <br />M in Beaver Highline Diversion of Middle Beaver Creek <br />Ea t Beaver Creek Diversion to Gurley Ditch <br />Lo e Cone Reservoir Enlargement <br />Lo e Cone Intake Ditch <br />G rIey Ditch Diversion to Lone Cone Reservoir <br /> <br />Function <br /> <br /> <br />Improve diversion efficiency. <br /> <br /> <br />Improve diversion efficiency. <br /> <br /> <br />Improve diversion efficiency. <br /> <br />Improve diversion efficiency. <br /> <br /> <br />Improve diversion efficiency. <br /> <br /> <br />Improve diversion efficiency, <br /> <br /> <br />Increase Storage. <br /> <br />Improve diversion efficiency. <br /> <br /> <br />Optimize use of storage. <br /> <br />The eleme ts found suitable for development to improve service to the Lilylands and Dry Creek areas are <br />identified ; the following: <br />Identification <br /> <br />Function <br />Increase Storage. <br />Relocation for new reservoir, <br /> <br />LiI . lands Reservoir Enlargement <br />LiI lands Reservoir Intake <br />Li lands Canal <br />Li lands Canal North and South Laterals <br />Li lands Intake Canal East of West Naturita <br /> <br />Rehabilitate, increase capacity, <br />Rehabilitate, increase capacity, <br />Rehabilitate, increase capacity. <br /> <br />The eleme Is found suitable for development to improve service to both the Norwood- Redvale and the Lilylands- <br />Dry Creek reas as well as supplying Radium Reservoir are identified as the following: <br /> <br />V-2 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.