My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00509
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153500
Contractor Name
San Miguel Water Conservancy District
Contract Type
Loan
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Chanter <br /> <br />Brief Description <br /> <br />I <br /> <br />Introduction and background information. <br /> <br />II <br /> <br />Characteristics of the study area and existing institutions, <br /> <br />III <br /> <br />Water rights and hydrologic analyses to determine the available water supply for potential <br />projects. <br /> <br />IV <br /> <br />Water demands of potential cropping patterns and improved irrigation water deliveries. <br /> <br />V <br /> <br />Identification and selection of project elements and formulation of four alternative projects. <br /> <br />VI <br /> <br />Evaluation and comparison of alternative projects. <br /> <br />VII <br /> <br />Institutional considerations. <br /> <br />VIII <br /> <br />Discussion of the Phase Two decision. <br /> <br />The Phase One study has been based on existing data and records available to the public. The plan of study did <br /> <br /> <br />not include gathering of new data such as installation of stream or diversion gaging stations, measurements of <br /> <br /> <br />flows, field instrument surveys, soil sampling. mapping, geologic foundation drilling or seismic investigations. <br /> <br /> <br />Maximum use has been made of data from previous investigations and studies by others. Estimates and <br /> <br /> <br />assumptions have been based on this data, limited field observations and several technical review sessions with <br /> <br /> <br />the study advisors. <br /> <br />1-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.