My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00509
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153500
Contractor Name
San Miguel Water Conservancy District
Contract Type
Loan
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"tudv Pr' ess <br /> <br />Work on he San Miguel Project study started in October 1986. In the first phase of the study, several <br />alternative project systems were formulated to provide a range of potentially viable project concepts, The water <br />yields and costs of these alternative project configurations were comparatively evaluated at a reconnaissance <br />level of ef . rt. The reconnaissance level of effort is intended to provide a preliminary, conceptual analysis to <br />distinguislthe major differences between alternatives and provide a preliminary indication of feasibility for <br />each alter ative. Assessments were made of the water availability and the water needs in the project areas. <br />Institution I factors, payment capacity of potential crops, and financing options were also considered. The <br />results of t e first phase of the study is presented in this Interim Report. <br /> <br />Based on hese analyses, a decision will be made at the end of Phase One whether to proceed further with <br />project pIa ning. If the decision is made to proceed to Phase Two of the study, one of the alternatives will be <br />selected fo detailed feasibility-level analysis. <br /> <br />A decisio period of about six weeks is proposed from early February to mid-March 1988, following <br />distributio of this Interim Report, to allow the study participants to decide whether to proceed and, if so, to <br />indicate th alternative to be evaluated in Phase Two. The work of Phase Two would begin in about April of <br />1988 and' ould require 5 months. <br /> <br />Public In rmation Proaram <br /> <br />The publiinformation program of the study has included newsletters and technical review sessions with the <br />study advi ors in the project area to keep interested parties informed on the progress of the study. Eight <br />technical r view sessions were held in the San Miguel Project area between January 1986 and December 1987. <br />Two newsl tters have been distributed to date and a public meeting to discuss the Phase One study results will <br />be held in he study area in February 1988. <br /> <br />Renort 0 ."anlzatlon <br /> <br />This Interiin Report is intended to provide the reader with a concise summary of the results of Phase One of <br />the study nd to assist the study participants in making a decision with regard to Phase Two of the study, The <br />report is 0 ganized as follows: <br /> <br />1-3 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.