My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150073 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150073 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2010 3:33:06 PM
Creation date
10/5/2006 11:58:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150073
Contractor Name
Southeastern Colorado Water Conservancy District
Contract Type
Grant
Water District
14
County
Pueblo
Bill Number
SB 01-157
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />, <br /> <br />. <br /> <br />. <br /> <br />municipal supplies using state-of-the-art technologies such as reverse osmosis or other appropriate <br />treatments and blending together with Fry-Ark Project water. Concept designs wilI be developed for <br />the options, based OP the preferred pipeline alignment. <br /> <br />The analysis will assess the engineering, economic and institutional feasibility of these alternatives. <br />The assessment would specifically cover the items listed in the RFP including: water treatment <br />requirements, treatment plant(s) capacity and locations, delivery and storage system modifications <br />and cost estimates and economic/financial analysis. <br /> <br />Task 9.0 - Feasibility Report <br />Our report wilI be prepared following guidelines published by the CWCB. <br /> <br />Task 10.0 - Meetings and Coordination <br />The RFP identifies eight meetings with the Study Steering Committee and three public meetings. As <br />appropriate, these meetings will include presentations by the engineering team and project economist, <br />supplemented with poster boards, graphics, and handouts to facilitate understanding of key issues, <br />water conveyance concepts, study conclusions, and recommendations. The public meetings wilI be <br />held in Lamar, La Junta, and Pueblo. The study meetings will be held in La Junta. One or two <br />members of our team will attend these meetings and work closely with the Steering Committee on <br />agendas, presentation materials, and logistics for all meetings. <br /> <br />II GEl Consultants, Inc. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.