Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />A range of potential pipeline cost can be obtained from the estimates by <br />making a best case and worst case comparison. If the pipeline were built <br />without having to draw upon the contingencies for the Q = 2.5 cfs <br />PVC/Permastran option, the cost would be about $2,640,000. The highest option <br />under Alignment B, with contingencies, would be $3,689,000. The $1,000,000 <br />difference makes it difficult to make firm allocations to the comoonents of <br />the Towaoc municipal system until final designs are preparerl and a1iqnments <br />cl eared for constrLlcti on. <br /> <br />Alignment A is recommended at either size of Q = 2.5 or 3.0 cfs, whichever is <br />preferred by the State and the Tribe. <br /> <br />3-53 <br /> <br />l060c <br />