My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00507
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153513
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I -~T~l <br /> <br />MOUNTAIN I <br />I UTE L., <br />RESERVATION J <br /> <br />I i <br />I L - -1 <br />Potentiol New Tank I <br />(Upper Tank I <br /> <br />L <br /> <br />I <br /> <br />I Existing <br />650,000 -- <br />I gollon Tonk <br />(Middle Tonk) <br /> <br />I Abondoned <br />1,000,000 <br />gallon tonk,- <br />I potentiol for <br />rehabilitation <br />(Lower Tonk) <br />I <br />I <br />I <br /> <br />Existing Row Woter <br />Supply Line from <br />Dolores Conol <br /> <br />- <br /> <br />N <br /> <br /> <br />1 <br /> <br /> <br />Proposed Treotment <br />Plont Byposs <br /> <br />Existing Cortez <br />~ / Treotment Plont <br /> <br />One of the Existing <br />Cortez Woter <br />Supply Lines <br /> <br />\ <br />Existing Treoted <br />Water Storage Tonk <br /> <br />,"--Proposed Towooc Water <br />Supply Line 19 to 23miles <br /> <br /> <br /> <br />'- Air releose volves, droin volves, <br />_______ond isolotion volves will be <br />instolled in the pipeline <br />ot oppropriate locations, <br /> <br />Potentiol New <br />-Pressure Zone <br /> <br /> <br />'-.. Proposed Flow <br />Control Stotion <br /> <br />(Not to Scale) <br /> <br />Potentiol Flow <br />Control Station <br /> <br />Existing Towooc <br />Woter Distribution <br />---- System <br /> <br />"- Potentiol New <br />Pressure Zone <br /> <br />Towaoc Pipeline System <br /> <br />Figure 3.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.