My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00507
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153513
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2.3.3 Peak Demand <br /> <br />Oesign flows for water supply systems are often as large as the estimatert peak <br />day average usage. Demand fluctuations during the day are generally more <br />economically supplied from storage facilities located near the point of use <br />than from extra capacity in the primary water supply line. Oesigning a water <br />supply 1 i ne for 1 ess than the peak daily average flow is sometimes cost <br />effective, depending upon the relationships between incremental costs of <br />terminal storage near points of use and the costs of incremental pipeline <br />capaci ty. Consequently, once the average demand rate for a muni ci pal i ty is <br />determined, the relationship between the average demand, peak demand, and <br />storage must be estab1 i shed to determi ne the optimal pi pel i ne desi gn flow <br />rate. In this report, the ratio of the peak period flow rate to the annual <br />average flow rate is referred to as the peaking factor. Peaking factors must <br />have the peri od defi ned--such as monthly, weekly, daily, or hourly--to fully <br />indicate the distribution of flow with time. <br /> <br />Many standard texts contain estimates of peaking factors. As presented by the <br />American Water Works Association (1952), the peaking factor for the peak daily <br />average flow for typical U. S. municipalities has been estimatel\ to he in the <br />range of 1.5 to 2. O. Because those estimates were made from records in the <br />northeastern United States, they are not expected to be directly applicable <br />for a town such as Towaoc. Western cities can reach daily peaking factors as <br />high as 3.0. <br /> <br />The Towaoc water allocation of 1000 af per year equates to a uniform flow rate <br />of 1.38 cfs or 620 gpm. Uti 1 i zi ng the maximum referenced peaki ng factor of <br />3.0, the maximum design the range of design flows for the pipeline is between <br />1.38 cfs and 4.14 cfs. The design flow and design peaking factor are <br />addressed in more detail in Chapter 3. <br /> <br />2-7 <br /> <br />l059c <br />
The URL can be used to link to this page
Your browser does not support the video tag.